This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2024/01/11 12:39] noji [Evacuating the Chamber] |
venting_pumping_intermediate_image_box [2024/01/11 14:51] noji [Venting the Chamber] |
||
---|---|---|---|
Line 39: | Line 39: | ||
- Put the GHS in vent mode by clicking **VENT** (valves #5 and #6 are open), | - Put the GHS in vent mode by clicking **VENT** (valves #5 and #6 are open), | ||
- monitor **RBT_BTS32: | - monitor **RBT_BTS32: | ||
- | - close **RV**, the valve to the roughing pump, and | + | - ensure that **RV**, the valve to the roughing pump, is closed, and |
- open **Vent** valve to start venting. | - open **Vent** valve to start venting. | ||