To vent the chamber: | To vent the chamber: | ||
- | - Put the GHS in vent mode by clicking **VENT** (valves #5 and #6 are open), | + | - Let the Control Room and the Vacuum Operation Group be aware as EXP alarms may occur, |
+ | - put the GHS in vent mode by clicking **VENT** (valves #5 and #6 are open), | ||
- monitor **RBT_BTS32: | - monitor **RBT_BTS32: | ||
- ensure that **RV**, the valve to the roughing pump, is closed, and | - ensure that **RV**, the valve to the roughing pump, is closed, and |