User Tools

Site Tools


venting_pumping_object_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
venting_pumping_object_box [2023/05/25 16:08]
swartzj
venting_pumping_object_box [2023/05/25 16:14]
swartzj
Line 39: Line 39:
   * After turning on the turbo pump, wait for the inner circle of the pump symbol to turn green and the pump to reach 40 000 rpm before you open the valve at TGV.    * After turning on the turbo pump, wait for the inner circle of the pump symbol to turn green and the pump to reach 40 000 rpm before you open the valve at TGV. 
   * When the pressure decreases to below 10-3 Torr, you should see the pressure bottom out on your BPG plot, you can turn on the IG and also plot its pressure over time.    * When the pressure decreases to below 10-3 Torr, you should see the pressure bottom out on your BPG plot, you can turn on the IG and also plot its pressure over time. 
- +{{ :20230525_155711.jpg?600 |The object chamber vacuum control page}}
- {{:wiki:20230525_155711.jpg|Object chamber vacuum control page}}+
  
venting_pumping_object_box.txt · Last modified: 2024/02/06 10:40 by noji