User Tools

Site Tools


venting_pumping_object_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
venting_pumping_object_box [2023/05/30 16:48]
swartzj
venting_pumping_object_box [2023/06/01 13:43]
swartzj
Line 6: Line 6:
   * Before you start, make sure that the gate valves named D2341 BGV and D2303 BGV are closed and that the IG is off.    * Before you start, make sure that the gate valves named D2341 BGV and D2303 BGV are closed and that the IG is off. 
   * The vent valve should also be closed when you begin.    * The vent valve should also be closed when you begin. 
-  * Both valves to the turbo pump should be closed and the turbo pump should be switched off if the chamber will be vented for a long time. +  * The valve to the turbo pump TVG should be closed. If the chamber will be vented for a long time, Valve FV should also be closed and the turbo pump should be switched off 
  
 The procedure is then as follows:  The procedure is then as follows: 
venting_pumping_object_box.txt ยท Last modified: 2024/02/06 10:40 by noji