Line 10: Line 10:
 The procedure is then as follows:  The procedure is then as follows: 
   - Close the valve to the roughing pump RV.    - Close the valve to the roughing pump RV. 
-  - Now you can plot the pressure at BPG to monitor the pressure before you open the vent valve. +  - Now you can plot the pressure vs time at BPG to monitor the pressure before you open the vent valve. 
   - **Keep a constant eye on the pressure level** as it increases rapidly. When it approaches 800 torr, **it is imperative that you close the venting valve.** Failure to do so will result in over-pressure in the chamber since it will continue to be filled with dry nitrogen.     - **Keep a constant eye on the pressure level** as it increases rapidly. When it approaches 800 torr, **it is imperative that you close the venting valve.** Failure to do so will result in over-pressure in the chamber since it will continue to be filled with dry nitrogen.  
   - You can now enter and open the chamber.    - You can now enter and open the chamber. 