User Tools

Site Tools


division_of_operation_responsibilities

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
division_of_operation_responsibilities [2013/12/21 07:47]
pereira [User responsibilities that may need support from Device Physicist]
division_of_operation_responsibilities [2016/11/09 15:36]
pereira [User responsibilities that may need support from Device Physicist]
Line 1: Line 1:
 ====== Division of operational responsibilities ====== ====== Division of operational responsibilities ======
 +A detailed description of the level of support from the Device physicist and the Beam physicist can be found in the [[http://www.nscl.msu.edu/files/s800_sld.pdf|S800 service level description]] and [[http://www.nscl.msu.edu/files/A1900_sld_2007.pdf|A1900 service level description]] documents. Please visit also the [[https://groups.nscl.msu.edu/s800/s800frameset.htm|guidance]] policy document for experiments in the S3 vault.
 +
  
 ====  Device Physicist ==== ====  Device Physicist ====
 +  * General tuning of S800 (XDT)
   * Determining biases   * Determining biases
   * Operation of gas handling systems   * Operation of gas handling systems
-  * Alarm support if initial response by experimenter does not resolve the issue 
  
 ==== User ==== ==== User ====
-  * [[Trigger#Trigger schematics|Trigger changes]] +  * Trigger changes 
-  * [[Detectors#Ionization chamber|Ionization chamber]] calibration +  * Installation of reaction targets in [[Stations|target area]] (pivot point) 
-  * Alarm monitoring and initial response +  * [[Vacuum control#Target Chamber|Target chamber vacuum]] system operation
-  * [[Stations|Target chamber (Pivot-point area)]] vacuum system operation +
-  * [[During experiments#Mask calibration|Mask calibration]]+
   * Tracking efficiency of [[Detectors#Plastic scintillators|OBJ scintillator]]   * Tracking efficiency of [[Detectors#Plastic scintillators|OBJ scintillator]]
   * Instalation of video camera in the Pivot-point area   * Instalation of video camera in the Pivot-point area
Line 17: Line 17:
  
 ==== User responsibilities that may need support from Device Physicist ==== ==== User responsibilities that may need support from Device Physicist ====
-  * [[Preparaton for tuning the S800#Magnetic-rigidity setting|Determination of magnetic rigidity for spectrograph settings]] +  * [[Magnetic-rigidity setting|Determination of magnetic rigidity for spectrograph settings]] 
-  * Implementing TOF and energy loss based PID corrections +  * [[During experiments#Particle Identification Corrections|Implementing PID corrections]] 
- +  * [[During experiments#Mask calibration|Mask calibration]] 
-In the absence of a S800 device physicist, please follow the official procedure for handing over the beam from the operators/beam physicists to the experimenters and vice versa:  +  [[Vacuum control#Target chamber|Venting lower-dipole section (to install aligning telescope)]]
- +
-[[https://intra.nscl.msu.edu/ccf/infoexperimenters/handingoverbeam.php]]+
  
-In case a S800 person needs to be contacted after-hours, please keep in mind that this has to be done by the Operator in Charge. In general, the operator routes requests from experimenters for after-hours laboratory resources to appropriate lab personnel.+In the absence of a S800 device physicist, please follow the official procedure for handing over the beam from the operators/beam physicists to the experimenters and vice versa: [[https://intra.nscl.msu.edu/ccf/infoexperimenters/handingoverbeam.php]].
  
-[[https://intra.nscl.msu.edu/ccf/infoexperimenters/operators.php]]+In case a S800 person needs to be contacted after-hours, please keep in mind that this has to be done by the Operator in Charge. In general, the operator routes requests from experimenters for after-hours laboratory resources to appropriate lab personnel (see  
 +[[https://intra.nscl.msu.edu/ccf/infoexperimenters/operators.php]] for more information).
  
  
division_of_operation_responsibilities.txt · Last modified: 2023/04/28 16:03 by swartzj