User Tools

Site Tools


division_of_operation_responsibilities

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
division_of_operation_responsibilities [2013/12/21 08:27]
pereira [Division of operational responsibilities]
division_of_operation_responsibilities [2023/04/28 16:03] (current)
swartzj
Line 1: Line 1:
 ====== Division of operational responsibilities ====== ====== Division of operational responsibilities ======
-A detailed description of the level of support from the Device physicist and the Beam physicist can be found in the [[http://www.nscl.msu.edu/files/A1900_sld_2007.pdf|A1900 service level description]] and S800 service level description documents. Please visit also the [[https://groups.nscl.msu.edu/s800/s800frameset.htm|guidance]] policy document for experiments in the S3 vault.+A detailed description of the level of support from the Device physicist and the Beam physicist can be found in the [[http://www.nscl.msu.edu/files/s800_sld.pdf|S800 service level description]] and [[http://www.nscl.msu.edu/files/A1900_sld_2007.pdf|A1900 service level description]] documents. Please visit also the [[https://groups.nscl.msu.edu/s800/s800frameset.htm|guidance]] policy document for experiments in the S3 vault.
  
  
 ====  Device Physicist ==== ====  Device Physicist ====
 +  * General tuning of S800 (XDT)
   * Determining biases   * Determining biases
   * Operation of gas handling systems   * Operation of gas handling systems
-  * Alarm support if initial response by experimenter does not resolve the issue 
  
 ==== User ==== ==== User ====
-  * [[Trigger#Trigger schematics|Trigger changes]] +  * Trigger changes 
-  * [[Detectors#Ionization chamber|Ionization chamber]] calibration +  * Installation of reaction targets in [[Stations|target area]] (pivot point) 
-  * Alarm monitoring and initial response +  * [[Vacuum control#Target Chamber|Target chamber vacuum]] system operation
-  * [[Stations|Target chamber (Pivot-point area)]] vacuum system operation +
-  * [[During experiments#Mask calibration|Mask calibration]]+
   * Tracking efficiency of [[Detectors#Plastic scintillators|OBJ scintillator]]   * Tracking efficiency of [[Detectors#Plastic scintillators|OBJ scintillator]]
-  * Instalation of video camera in the Pivot-point area+  * Installation of video camera in the Pivot-point area
  
  
 ==== User responsibilities that may need support from Device Physicist ==== ==== User responsibilities that may need support from Device Physicist ====
   * [[Magnetic-rigidity setting|Determination of magnetic rigidity for spectrograph settings]]   * [[Magnetic-rigidity setting|Determination of magnetic rigidity for spectrograph settings]]
-  * Implementing TOF and energy loss based PID corrections+  * [[During experiments#Particle Identification Corrections|Implementing PID corrections]] 
 +  * [[During experiments#Mask calibration|Mask calibration]] 
 +  * [[Vacuum control#Target chamber|Venting lower-dipole section (to install aligning telescope)]]
  
 In the absence of a S800 device physicist, please follow the official procedure for handing over the beam from the operators/beam physicists to the experimenters and vice versa: [[https://intra.nscl.msu.edu/ccf/infoexperimenters/handingoverbeam.php]]. In the absence of a S800 device physicist, please follow the official procedure for handing over the beam from the operators/beam physicists to the experimenters and vice versa: [[https://intra.nscl.msu.edu/ccf/infoexperimenters/handingoverbeam.php]].
division_of_operation_responsibilities.1387632454.txt.gz · Last modified: 2013/12/21 08:27 by pereira