User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
installation_fp_sci [2017/06/20 17:15]
pereira [Vent focal-plane chamber]
installation_fp_sci [2018/04/11 16:11]
pereira [Pumping focal-plane chamber]
Line 3: Line 3:
 ===== Vent focal-plane chamber ===== ===== Vent focal-plane chamber =====
   * Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased   * Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased
-  * Open the [[gas_handling_system#labview_control_program|Labview gas handling system]] and verify that there is no gas in the CRDCs and IC. Open valves **4** (IC supply), **5** (IC bypass), **6** (IC focal-plane bypass), **20** (CRDC supply), **21** (CRDC bypass), and **22** (CRDC focal-plane bypass). The rest of the valves should be closed+  * Open the [[gas_handling_system#labview_control_program|Labview gas handling system]] and verify that there is no gas in the CRDCs and IC. Open valves **4** (IC supply), **5** (IC bypass), **6** (IC focal-plane bypass), **7** (Ion Chamber vent), **20** (CRDC supply), **21** (CRDC bypass), and **22** (CRDC focal-plane bypass) and **23** (CRDC vent). The rest of the valves should be closed
   * Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below)  {{:wiki:fp-venting-valve-Daniel.jpg?350|FP chamber manual venting valve}} {{:wiki:fp-venting-valve.jpg?350|FP chamber manual venting valve}}   * Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below)  {{:wiki:fp-venting-valve-Daniel.jpg?350|FP chamber manual venting valve}} {{:wiki:fp-venting-valve.jpg?350|FP chamber manual venting valve}}
   * Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]])   * Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]])
Line 11: Line 11:
 {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}}  {{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}} 
   * Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read slightly above atmospheric pressure (due to the dry N2 flow pumped to the chamber). The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"   * Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read slightly above atmospheric pressure (due to the dry N2 flow pumped to the chamber). The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED"
-  * When the chamber is fully vented, select **VENT STATUS** and click **STOP VENTING PROCEDURE**. This will automatically close the vent valve ***I260VV*+  * When the chamber is fully vented, select **VENT STATUS** and click **STOP VENTING PROCEDURE**. This will automatically close the vent valve **I260VV**
   * Close the manual vent valve   * Close the manual vent valve
  
Line 45: Line 45:
 ===== Pumping focal-plane chamber ===== ===== Pumping focal-plane chamber =====
   * Make sure that the pressure-relief valve and the manual vent valve (see above) are closed.   * Make sure that the pressure-relief valve and the manual vent valve (see above) are closed.
-  * Make sure that manual valve of the mechanical pump is opened {{:wiki:ManualValve-fp.jpg?350|Manual valve pump}} +  * Make sure that manual valve of the mechanical pump is opened (the valve **I260RV** will be automatically opened in the next step) {{:wiki:ManualValve-fp.jpg?350|Manual valve pump}} 
-  * Open PanelMate **S800vac** and go to page 07. Make sure +  * Open PanelMate **S800vac** and go to page 07. Make sure that the venting valve **I260VV** is closed (see last step of the [[#Vent focal-plane chamber|venting process]] described above)
   * Select window **PUMPDOWN STATUS** and click on button **START PUMPDOWN**. The **PUMPDOWN STATUS** and **VENT STATUS** windows should display "PUMPDOWN IN PROGRESS"   * Select window **PUMPDOWN STATUS** and click on button **START PUMPDOWN**. The **PUMPDOWN STATUS** and **VENT STATUS** windows should display "PUMPDOWN IN PROGRESS"
-  * Wait for some hours until vacuum is good+       * After the rough valve **I260RV** is automatically open, the mechanical pump will start pumping. 
 +       * The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down slowly after few seconds (otherwise, the chamber is not properly closed). 
 +       * When pressure in the chamber (from **I261PG**) gets below 100 mTorr (at least 30 min), **I260RV** will close. Foreline valve **I260FV** will open followed by the turbo gate valve **I260GV**. 
 +  * Wait for few hours until vacuum is good. You can then turn on the ion gauge **I264IG** 
 + 
installation_fp_sci.txt · Last modified: 2023/08/18 10:19 by noji