installation_fp_sci [2017/06/20 17:28] pereira [Pumping focal-plane chamber] |
installation_fp_sci [2017/06/21 15:31] pereira [Pumping focal-plane chamber] |
||
---|---|---|---|
Line 45: | Line 45: | ||
===== Pumping focal-plane chamber ===== | ===== Pumping focal-plane chamber ===== | ||
* Make sure that the pressure-relief valve and the manual vent valve (see above) are closed. | * Make sure that the pressure-relief valve and the manual vent valve (see above) are closed. | ||
- | * Make sure that manual valve of the mechanical pump is opened (there valve **I260RV** will be automatically opened in the next step) {{: | + | * Make sure that manual valve of the mechanical pump is opened (the valve **I260RV** will be automatically opened in the next step) {{: |
* Open PanelMate **S800vac** and go to page 07. Make sure that the venting valve **I260VV** is closed (see last step of the [[#Vent focal-plane chamber|venting process]] described above) | * Open PanelMate **S800vac** and go to page 07. Make sure that the venting valve **I260VV** is closed (see last step of the [[#Vent focal-plane chamber|venting process]] described above) | ||
* Select window **PUMPDOWN STATUS** and click on button **START PUMPDOWN**. The **PUMPDOWN STATUS** and **VENT STATUS** windows should display " | * Select window **PUMPDOWN STATUS** and click on button **START PUMPDOWN**. The **PUMPDOWN STATUS** and **VENT STATUS** windows should display " | ||
+ | * After the rough valve **I260RV** is automatically open, the mechanical pump will start pumping. | ||
+ | * The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down slowly after few seconds (otherwise, the chamber is not properly closed). | ||
+ | * When pressure in the chamber (from **I261PG**) gets below 100 mTorr, **I260RV** will close. Foreline valve **I260FV** will open followed by the turbo gate valve **I260GV**. | ||
* The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down after few seconds | * The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down after few seconds | ||