installation_fp_sci [2017/06/21 15:31]
pereira [Pumping focal-plane chamber]
installation_fp_sci [2017/06/22 11:58]
pereira [Pumping focal-plane chamber]
Line 51: Line 51:
        * The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down slowly after few seconds (otherwise, the chamber is not properly closed).        * The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down slowly after few seconds (otherwise, the chamber is not properly closed).
        * When pressure in the chamber (from **I261PG**) gets below 100 mTorr (at least 30 min), **I260RV** will close. Foreline valve **I260FV** will open followed by the turbo gate valve **I260GV**.        * When pressure in the chamber (from **I261PG**) gets below 100 mTorr (at least 30 min), **I260RV** will close. Foreline valve **I260FV** will open followed by the turbo gate valve **I260GV**.
-  ​* The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down after few seconds¬†+  * Wait for few hours until vacuum is good. You can then turn on the ion gauge **I264IG**
-  ​* Wait for some hours until vacuum is good+
  
  