User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
installation_fp_sci [2018/04/09 12:33]
pereira [Pumping focal-plane chamber]
installation_fp_sci [2018/04/11 16:11]
pereira [Pumping focal-plane chamber]
Line 52: Line 52:
        * When pressure in the chamber (from **I261PG**) gets below 100 mTorr (at least 30 min), **I260RV** will close. Foreline valve **I260FV** will open followed by the turbo gate valve **I260GV**.        * When pressure in the chamber (from **I261PG**) gets below 100 mTorr (at least 30 min), **I260RV** will close. Foreline valve **I260FV** will open followed by the turbo gate valve **I260GV**.
   * Wait for few hours until vacuum is good. You can then turn on the ion gauge **I264IG**   * Wait for few hours until vacuum is good. You can then turn on the ion gauge **I264IG**
-  * Close the CRDC and Ion Chamber venting valves **7** and **23** in the  [[gas_handling_system#labview_control_program|Labview gas handling system]]+ 
installation_fp_sci.txt ยท Last modified: 2023/08/18 10:19 by noji