This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
installation_fp_sci [2018/04/11 16:26] pereira [Pumping focal-plane chamber] |
installation_fp_sci [2019/07/01 08:22] pereira [Installation of focal-plane scintillator] |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Installation of focal-plane scintillator ====== | ====== Installation of focal-plane scintillator ====== | ||
+ | In June 2019, a new Turbo Pump with magnetically-levitating bearings (Leybold MAG 2200iP) was installed in the S800 focal-plane chamber. This pump has a dry-N line connected to it that is purging continuously the bearings. This creates an extra pressure in the foreline, which must be pumping down continuously. Therefore, it is critical turn off the turbo pump whenever the foreline valve needs to be closed. | ||
+ | |||
+ | Instructions on how to vent/ | ||
===== Vent focal-plane chamber ===== | ===== Vent focal-plane chamber ===== | ||
* Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased | * Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased | ||
- | * Open the [[gas_handling_system# | + | * Open the [[gas_handling_system# |
* Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) | * Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) | ||
* Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]]) | * Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]]) |