This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
installation_fp_sci [2019/07/01 09:08] pereira [Vent focal-plane chamber] |
installation_fp_sci [2019/07/01 09:28] pereira [Vent focal-plane chamber] |
||
---|---|---|---|
Line 15: | Line 15: | ||
* Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~1 torr every 15 seconds (see figures below) | * Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~1 torr every 15 seconds (see figures below) | ||
{{: | {{: | ||
+ | * Make sure that pressure inside the CRDCs and IC detectors (LabView) increase at the same rate than the pressure in the chamber. Otherwise, stop the venting process inmediately. | ||
* Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read slightly above atmospheric pressure (due to the dry N2 flow pumped to the chamber). The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display " | * Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read slightly above atmospheric pressure (due to the dry N2 flow pumped to the chamber). The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display " | ||
* Meanwhile, turn the turbo pump off using PanelMate **S800vac**: | * Meanwhile, turn the turbo pump off using PanelMate **S800vac**: |