Instructions on how to vent/ | Instructions on how to vent/ | ||
===== Vent focal-plane chamber ===== | ===== Vent focal-plane chamber ===== | ||
- | * Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased | + | * Open the [[hv_bias|HV Remote Control]] GUI and ensure that the gas focal-plane detectors |
+ | * Make sure that the CRDC grid gate is off (HV is in dU6) | ||
+ | * Make sure that the CRDC preamps and interface boards are turned off (it is located in the NIM crate attached to the S800 focal-plane chamber) | ||
+ | * In order to avoid condensation from the cooling system, turn off the chiller sitting under the S800 focal-plane chamber. Wait for at least a couple of hours before venting the chamber. | ||
* Open the [[gas_handling_system# | * Open the [[gas_handling_system# | ||
* Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) | * Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below) |