User Tools

Site Tools


installation_fp_sci

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
installation_fp_sci [2019/07/01 09:03]
pereira [Vent focal-plane chamber]
installation_fp_sci [2023/08/18 10:19] (current)
noji [Zeroing PTs]
Line 1: Line 1:
-====== Installation of focal-plane scintillator ======+====== Venting/pumping FP chamber & emptying/filling gaseous detectors ======
  
-In June 2019, a new Turbo Pump with magnetically-levitating bearings (Leybold MAG 2200iP) was installed in the S800 focal-plane chamber. This pump has a dry-N line connected to it that is purging continuously the bearings. This creates an extra pressure in the foreline, which must be pumping down continuously. Therefore, it is critical turn off the turbo pump whenever the foreline valve needs to be closed.+//In June 2019, a new Turbo Pump with magnetically-levitating bearings (Leybold MAG 2200iP) was installed in the S800 focal-plane chamber. This pump has a dry-N line connected to it that is purging continuously the bearings. This creates an extra pressure in the foreline, which must be pumping down continuously. Therefore, it is critical turn off the turbo pump whenever the foreline valve needs to be closed.//
  
-Instructions on how to vent/pump-down the focal-plane chamber are described below. +The GHS for the focal plane is operated remotely through CS studioIts page can be found on the EXP network through FRIB EXP Main → S800 → GHS Pages (Secondary Pages→ FP Main Page and is shown below.
-===== Vent focal-plane chamber ===== +
-  * Open the [[hv_bias|HV Remote Control]] GUI and ensure that the focal-plane detectors are unbiased +
-  * Open the [[gas_handling_system#labview_control_program|Labview gas handling system]] and verify that there is no gas in the CRDCs and ICMake sure that the only open valves are **4** (IC supply), **5** (IC bypass), **6** (IC focal-plane bypass), **7** (Ion Chamber vent), **20** (CRDC supply), **21** (CRDC bypass), and **22** (CRDC focal-plane bypass) and **23** (CRDC vent). The rest of the valves should be closed +
-  * Ensure that the manual venting valve located on the south side of the chamber is closed (see figures below {{:wiki:fp-venting-valve-Daniel.jpg?350|FP chamber manual venting valve}} {{:wiki:fp-venting-valve.jpg?350|FP chamber manual venting valve}} +
-  * Ensure that the FP ion gauge (I264IG) is off (see details [[vacuum_control|here]]) +
-  * Open PanelMate and select **S800vac** file in directory \\exp\files\control\ncsdata\General\Qt\Templates, and go to page 07 (see figure below)  +
-{{:wiki:NewPanelMate-S800FPVac.jpg?450|Panel Mate Vacuum FP chamber}} +
-  * Close I265GV (gate valve separating FP box from rest of beam line) is closed. +
-  * Click on the **VENT STATUS** window and begin the venting procedure. The **VENT VALVE I260VV** window will turn red and display "OPEN". The pressure should remain constant because the manual venting valve is still closed. The turbo GV I260GV will be closed, isolating the turbo pump from the focal-plane chamber. +
-  * Gently open the manual venting valve until the pressure displayed in the Pirani Gauge (see figure below) increases by ~1 torr every 15 seconds (see figures below)  +
-{{:wiki:fp-pirani.jpg?350|FP chamber manual venting valve}}  +
-  * Wait until the chamber is vented (few hours). The **I261PG** Pirani Gauge should read slightly above atmospheric pressure (due to the dry N2 flow pumped to the chamber). The window **VENT STATUS** in PanelMate should display "VENT VALVE OPEN". The window **PUMPDOWN STATUS** should display "PUMPDOWN STOPPED" +
-  * Meanwhile, turn the turbo pump off using PanelMate and select **S800vac** +
-  * When the chamber is fully vented, select **VENT STATUS** and click **STOP VENTING PROCEDURE**. This will automatically close the vent valve **I260VV** +
-  * Close the manual vent valve+
  
-===== Open focal-plane chamber =====+{{:wiki:fp-ghs-css.png|}}
  
-  * After venting the FP chamber, the pressure inside the chamber is slightly above atmospheric due to the dry N2 pumped. Before opening the chamber, it is recommended to vent the extra N2 by "forcing" the pressure-relief valve  with e.ga screwdriver {{:wiki:screwdriver-flange.jpg?350}} +Here are screenshots of the "FP_State_Buttonspage for the CRDC (left) and Ion Chamber (right)Currently in "PUMP status
-  * Unlock the padlock protecting the power brakers of the switch controls to open the chamber, and press the **START** button {{:wiki:padlock-note.jpg?350|Padlock}} +{{:wiki:fp_state_buttons_crdc.jpg?300|}} 
-  * Turn the switch to open the clamps holding the FP chamber. The weight held by the hydraulic piston will increase {{:wiki:switch-clamps.jpg?250|Switch clamps}} {{:wiki:clamps.jpg?400|Clamps holding FP chamber}} {{:wiki:scale.jpg?350|Scale FP chamber}} +{{:wiki:fp_state_buttons_ic.jpg?300|}}
-  * Turn on the switch to activate the motor opening the chamber. It takes about 10 minutes to get the chamber totally opened {{:wiki:fp-chamber-motor.jpg?250|Motor switch to open FP chamber}}+
  
 +Instructions on how to vent/pump-down the focal-plane chamber and empty/fill and run detectors are described below.
  
-===== Installing FP scintillator =====+===== Emptying Detectors ===== 
 +  - Check that the system is in **RUN** mode on the “FP_State_Buttons” page under FRIB EXP Main → S800 → GHS Pages (Secondary Pages) 
 +  - Return to “GHS_FP_Main” click **Enable MFC Controls**  
 +  - Set MFC1 to 0 sccm to stop the flow of P10 to the IC vessel 
 +  - Set MFC2 to 0 sccm. This will cause MFC3 to also go to zero through the ratio control. The flow of iC4H10 and CF4 to the CRDC chamber will cease. 
 +  - Click **Enable Controls** for the CRDC and IC Control Valve PIDs and then click **DISABLE** for each of them. This will open the control valve to 100% for each vessel and begin pumping them out. 
 +  - The IC vessel has a much larger quantity of gas compared to the CRDC vessel. In order to pump them out at a similar speed go to the “FP_State_Buttons” page and go to the D2708 (Ion Chamber) tab. Click **EMPTY**. This will more rapidly pump down the IC vessel. Both vessels should be emptied at about the same time. 
 +  - Open a data browser and plot the PVs for PT1 (S800_GHS:CMG_D2708A:VP_RD) and PT2 (S800_GHS:CMG_D2703A:VP_RD).  
 +  - Wait for PT1 and PT2 to read < 0.5 Torr. This should take about 30 minutes. 
 +  - Open the Focal Plane VAC D2686 page (FRIB EXP Main → S800 → Vacuum Main → Focal Plane). 
 +  - Ensure the beamline gate valve to the FP chamber is closed (BGV_D2671). 
 +  - Ensure IG_D2686 is off. 
 +  - Notify the Control Room that EXP alarms may occur. 
 +  - On the “FP_State_Buttons” page, click VENT mode for both D2703 (CRDCs) and D2708 (Ion Chamber). 
 +  - The detector volumes will be bypassed to the chamber. The TGV and TMP should handle the gas load and quickly pump the chamber back to high vacuum. If any issues occur, contact the Rare Isotope Operations Vacuum Group. 
 +  - The IG may turned back on once the BPG reads < 5 mTorr. 
 +  - The GHSs can remain in this state until they need to be filled again.
  
-  * The figure below shows the FP chamber open, with the "old" FP scintillator to be replaced by the new one {{:wiki:E1-view.jpg?350|FP chamber opened}} +===== Venting FP Chamber =====
-  * Unplug the bases of the up and down phototubes. The platic tie holding the cable of the up phototube to the chamber needs to be cut {{:wiki:e1-up-Daniel.jpg?400|UP base phototube}}   {{:wiki:e1-down-closeup.jpg?250|DOWN base phototube}} +
-  * Using an allen wrench, unscrew the two bolts attaching the scintillator frame to the base of the chamber {{:wiki:e1-frame-bolts.jpg?350|Scintillator frame}} +
-  * Climb to the chamber and pull the scintillator frame up. Once unplugged, handle it to a second person {{:wiki:Daniel-Jorge-1.jpg?350|FP chamber opened}} {{:wiki:Daniel-Jorge-2.jpg?350|FP chamber opened}} +
-  * With the help of a second person, hold the new scintillator by its frame and place it in the right spot. A second person should be ready to screw the frame to the base of the chamber +
-  * Connect the bases of the up and down phototubes. The later is quite difficult because one cannot see the pins +
-  * Using a plastic tie, attach the cable of the up phototube to the scintillator frame+
  
 +Notify the Control Room that you will vent the FP chamber.
  
 +  - Ensure the IG in the Focal Plane Pumping Station is off. This page can be found in FRIB EXP Main → S800 → Vacuum Main (Primary Pages) → Focal Plane.
 +  - Check the box next to “Valve Controls”, then click **Close** next to the Turbo Gate Valve (TGV).
 +  - Turn the TMP off.
 +  - Ensure both CRDCs and IC are in *VENT* mode
 +  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and PT3 (S800_GHS:CMG_D2708C:VP_RD) from the “GHS_FP_Main” page as well as BPG (RBT_BTS34:BPG_D2686:VP_RD) from the “D2686 Pumping Station” page on the same axis.
 +  - Briefly (~1 second) open the vent valve by clicking **Open** next to the valve labeled “Vent” then click **Close**. Check that all the pressures are increasing at the same rate.
 +  - Again, open the vent valve and observe the pressure for 30 seconds to ensure the pressures are increasing at the same rate among all four gauges. If a difference of > 2 Torr is observed between any two gauges, click **Close** on the vent valve.
 +  - Allow the pressure to rise to ~735 Torr (~45 min). The vent valve __should__ close itself at 735 Torr but be ready to close it manually if an error occurs.
  
 +The CRDC (Purple) and IC (Green) vessel pressures during Emptying and Venting procedures outlined above are shown below.
  
 +{{:wiki:crdc_ic_pressures_during_empty_vent.png|}}
 +
 +===== Pumpdown of FP Chamber =====
 +
 +  - Open “Focal Plane Pumping Station” page from FRIB EXP Main → S800 → Vacuum Main (Primary Pages).
 +  - Open “GHS_FP_Main” and “FP_State_Buttons” pages from FRIB EXP Main → S800 → GHS Pages (Secondary Pages).
 +  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and PT3 (S800_GHS:CMG_D2708C:VP_RD) from the “GHS_FP_Main” page as well as BPG (RBT_BTS34:BPG_D2686:VP_RD) from the “D2686 Pumping Station” page on the same axis.
 +  - On the “FP_State_Buttons” page change from “Vent” mode to “Pump” mode by clicking **PUMP** in both the D2703 (CRDC) and D2708 (IC) tabs.
 +  - Check the box next to “Valve Controls” on the “Focal Plane VAC D2686” page.
 +  - Ensure the TMP is **off** and Foreline Valve (FV) is closed. Open the Roughing Valve (RV) briefly (2 seconds) by clicking **Open** and observe the behavior of the pressure gauges. If they all decrease at the same rate, again click **Open** to begin roughing out the chambers.
 +  - When the BPG reads < 300 mTorr, **Close** RV and **Open** FV. Turn the TMP on. When the TMP is “at speed”, **Open** the TGV.
 +  - Once the BPG reads < 5 mTorr, the IG may be turned on.
 +
 +===== Filling & Running Detectors =====
 +
 +  - Ensure that the FP chamber is under high vacuum, detectors are bypassed to the chamber, and detector gas bottles are open.
 +  - On the “FP_State_Buttons” page click **RUN** on both D2703 (CRDC) and D2708 (Ion Chamber) tabs.
 +  - Plot PT1 (S800_GHS:CMG_D2708A:VP_RD), PT2 (S800_GHS:CMG_D2703A:VP_RD), and the control valves for both D2703 (CRDC, S800_GHS:CV_D2703:POS_RD_VLV) and D2708 (IC, S800_GHS:CV_D2708:POS_RD_VLV).
 +  - Click **Enable Controls** for the CRDC and IC “Control Valve PID”s, then click **ENABLE** to turn on PID controls for each vessel. Each control valve should adjust to its BASE value.
 +  - If the CRDC valve remains completely open (stuck at 100%), open a probe with PV: “S800_GHS:CV_D2703:MODE_CSET_PVC”. In the “New Value” box, enter “CLOSE” and press enter. If the valve then closes (100% to 0%), enter “AUTO” in the “New Value” box and press enter. This should reenable PID control.
 +  - Click **Enable MFC Controls**.
 +  - Set MFC1 to 25 sccm. Ensure PT1 begins to increase in pressure. 
 +  - Set MFC2 to 8 sccm. Ensure MFC3 automatically sets to 32 sccm and PT2 begins to increase in pressure.
 +  - The IC vessel is a much larger chamber than the CRDC vessel and needs to reach a higher operating pressure. In order to fill the vessel in a timely manner it is safe to override the MFC and set it to “Fully Open”. To do this select “Fully Open MFC” in the dropdown menu next to MFC1.
 +  - If desired, the CRDC vessel can be filled with MFC2 set to 16 sccm. Be ready to decrease MFC2 back to 8 sccm at **35 Torr** as the PID controls are not calibrated to prevent the vessel from overpressurizing at this increased flow. Allow the CRDC vessel to slowly approach 40 Torr.
 +    - If CSET is not set to 40 Torr, decrease MFC2 at **5 Torr** below the setpoint.
 +  - As the vessels approach their setpoints the Control Valves should begin to increase from their BASE values in order to equalize the pressure around the setpoint. Note that the CRDC pressure will change much faster than the IC pressure and has a much smaller tolerance. If PT2 reaches **45 Torr** the system will immediately enter “EMPTY” mode to prevent the foil disc from bursting. Use the figure below for reference. {{:wiki:crdc_vessel_filling_with_pid_control.png|}}
 +  - If PT2 reaches **44 Torr** and the control valve is not open enough to start decreasing the pressure, immediately set MFC2 to 0 sccm and allow the valve to begin decreasing the pressure before resetting MFC2 back to 8 sccm. Notify the Rare Isotope Operations Vacuum Group. Continue to monitor the pressure and control valve behavior to ensure the PID is in control of the pressure.
 +  - Once PT1 reaches **300 Torr**, adjust MFC1 back to 25 sccm by selecting “Go to MFC Setpoint” in the dropdown menu next to MFC1. The pressure will equilibrate down to about **299.5 Torr**. Allow the IC vessel to slowly approach 300 Torr. Use the figure below for reference.{{:wiki:ic_vessel_filling_with_pid_control.png|}}
 +    - If CSET is not set to **300 Torr**, adjust MFC1 back to 25 sccm when the setpoint is reached.
 +  - The control valve for the IC vessel is set to react slowly as the vessel has a long pressure period. The valve will not “wake up” until 300 Torr is reached on PT1. This is okay as long as the control valve begins to open by this point. The pressure change is slow enough that over the next hour the valve will open enough to catch the pressure before it exceeds **305 Torr**, well within the operating limit (500 Torr). 
 +  - The PID controls for each vessel are calibrated to maintain their respective setpoints to within +/- 0.1 Torr. If the operator notices a larger variation after an hour of PID control, notify the Rare Isotope Operations Vacuum Group.
 +
 +===== Zeroing PTs =====
 +
 +  * When readings of the capacitance manometers (PT1 [S800_GHS:CMG_D2708A:VP_RD], PT2 [S800_GHS:CMG_D2703A:VP_RD], and PT3 [S800_GHS:CMG_D2708C:VP_RD]) are off (e.g. 1 Torr when pumped down), these need to be zeroed.
 +  * **Before “zeroing” a pressure gauge. Make sure it is completely bottomed out.** This would correspond to the GHS being in “Vent” mode and the TMP being on. If the IG is on and shows that the system is under High Vacuum (<10-3 Torr) you can go ahead and zero the gauge.
 +  * Here are instructions with screenshots by Josh:
 +    * {{::zeroingpressuregauges1.png|}}
 +    * {{::zeroingpressuregauges2.png|}}
 +    * {{::zeroingpressuregauges3.png|}}
 +  * The relevant PVs are "ZERO_CMD" instead of "VP_RD", e.g. S800_GHS:CMG_D2708A:ZERO_CMD for PT1. Send "1" to zero these PTs.
 +
 +====== Opening/closing FP chamber ======
 + 
 +Instructions on how to open/close the focal-plane chamber are described below.
 +
 +===== Open focal-plane chamber =====
 +
 +  * After venting the FP chamber, the pressure inside the chamber is slightly above atmospheric due to the dry N2 pumped. Before opening the chamber, it is recommended to vent the extra N2 by "forcing" the pressure-relief valve  with e.g. a screwdriver {{:wiki:screwdriver-flange.jpg?350}}
 +  * Unlock the padlock protecting the power brakers of the switch controls to open the chamber, and press the **START** button {{:wiki:padlock-note.jpg?350|Padlock}}
 +  * Turn the switch to open the clamps holding the FP chamber. The weight held by the hydraulic piston will increase {{:wiki:switch-clamps.jpg?250|Switch clamps}} {{:wiki:clamps.jpg?400|Clamps holding FP chamber}} {{:wiki:scale.jpg?350|Scale FP chamber}}
 +  * Turn on the switch to activate the motor opening the chamber. It takes about 10 minutes to get the chamber totally opened {{:wiki:fp-chamber-motor.jpg?250|Motor switch to open FP chamber}}
  
 ===== Closing focal-plane chamber ===== ===== Closing focal-plane chamber =====
Line 47: Line 105:
   * Turn the knob to close the clamps   * Turn the knob to close the clamps
   * Inspect the clamps and chamber flange (no gaps) to ensure that the chamber is properly sealed   * Inspect the clamps and chamber flange (no gaps) to ensure that the chamber is properly sealed
-  * Before pumping the chamber down, make sure that the scintillator is properly connected. This can be done by biasing the detector and checking the signals, either from the scalers or with a scope. One should clearly see cosmic rays; if that is not the case, the phototubes are likely miss connected+  * Before pumping the chamber down, make sure that the scintillator is properly connected. This can be done by biasing the detector and checking the signals, either from the scalers or with a scope. One should clearly see cosmic rays; if that is not the case, the phototubes are likely misconnected. 
 + 
 +====== Installing FP scintillator ====== 
 + 
 +Instructions on how to install the focal-plane scintillator are described below. 
 + 
 +  * The figure below shows the FP chamber open, with the "old" FP scintillator to be replaced by the new one {{:wiki:E1-view.jpg?350|FP chamber opened}} 
 +  * Unplug the bases of the up and down phototubes. The platic tie holding the cable of the up phototube to the chamber needs to be cut {{:wiki:e1-up-Daniel.jpg?400|UP base phototube}}   {{:wiki:e1-down-closeup.jpg?250|DOWN base phototube}} 
 +  * Using an allen wrench, unscrew the two bolts attaching the scintillator frame to the base of the chamber {{:wiki:e1-frame-bolts.jpg?350|Scintillator frame}}. 
 +  * Climb to the chamber and pull the scintillator frame up. Once unplugged, handle it to a second person {{:wiki:Daniel-Jorge-1.jpg?350|FP chamber opened}} {{:wiki:Daniel-Jorge-2.jpg?350|FP chamber opened}}. 
 +  * With the help of a second person, hold the new scintillator by its frame and place it in the right spot. A second person should be ready to screw the frame to the base of the chamber. 
 +  * Connect the bases of the up and down phototubes. The latter is quite difficult because one cannot see the pins 
 +  * Using a plastic tie, attach the cable of the up phototube to the scintillator frame 
  
-===== Pumping focal-plane chamber ===== 
-  * Make sure that the pressure-relief valve and the manual vent valve (see above) are closed. 
-  * Make sure that manual valve of the mechanical pump is opened (the valve **I260RV** will be automatically opened in the next step) {{:wiki:ManualValve-fp.jpg?350|Manual valve pump}} 
-  * Open PanelMate **S800vac** and go to page 07. Make sure that the venting valve **I260VV** is closed (see last step of the [[#Vent focal-plane chamber|venting process]] described above) 
-  * Select window **PUMPDOWN STATUS** and click on button **START PUMPDOWN**. The **PUMPDOWN STATUS** and **VENT STATUS** windows should display "PUMPDOWN IN PROGRESS" 
-       * The vent valve **I260VV** and foreline valve **I260FV** will be automatically closed 
-       * After the rough valve **I260RV** is automatically open, the mechanical pump will start pumping. 
-       * The pressures in the mechanical pump (from **I259PG**) and beam chamber (from **I261PG**) will jump momentarily to very high values. They should go down slowly after few seconds (otherwise, the chamber is not properly closed). 
-       * When pressure in the chamber (from **I261PG**) gets below 100 mTorr (at least 30 min), **I260RV** will close. Foreline valve **I260FV** will open followed by the turbo gate valve **I260GV**. 
-  * Wait for few hours until vacuum is good. You can then turn on the ion gauge **I264IG** 
-  
installation_fp_sci.1561986213.txt.gz · Last modified: 2019/07/01 09:03 by pereira