User Tools

Site Tools


to-do_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
to-do_list [2018/05/02 16:36]
pereira [In data U6]
to-do_list [2018/05/02 16:39]
pereira [In data U6]
Line 44: Line 44:
    
   * [[Magnetic-rigidity setting|Set spectrograph Brho]] (coordinate with experimenters)   * [[Magnetic-rigidity setting|Set spectrograph Brho]] (coordinate with experimenters)
 +
 +
 +
 +
 +===== At the end of the experiment =====
 +  * Verify with S800 Device Physicist that S800 DAQ software is uninstalled. This can be done by typing script ''gouninstalldaq'' (please, contact Device Physicist if you are not sure of what you're doing)
 +
 +  * Unbias detectors, CRDC interface boards, CRDCs gate, etc
 +
 +  * Remove gas from CRDCs and Ion Chamber 
  
  
  
to-do_list.txt ยท Last modified: 2023/10/19 17:15 by swartzj