to-do_list [2023/09/22 12:48]
swartzj [Setting up DAQ software]
to-do_list [2023/10/19 17:12]
swartzj
Line 7: Line 7:
   * [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm)   * [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm)
  
-  * Ensure that the object scintillator is in good conditions and has enough shimming positions to withstand the expected rates during the course of the experiment. The guideline document describing the installation and shimming procedure can be accessed [[https://docmgmt.nscl.msu.edu/share/page/site/NSCL/document-details?nodeRef=workspace://SpacesStore/cad088ca-6d41-4025-b010-8e620806a48b|here]] +  * Ensure that the object scintillator is in good condition and has enough shimming positions to withstand the expected rates during the course of the experiment. The guideline document describing the installation and shimming procedure can be accessed [[https://docmgmt.nscl.msu.edu/share/page/site/NSCL/document-details?nodeRef=workspace://SpacesStore/cad088ca-6d41-4025-b010-8e620806a48b|here]] 
    
   * [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]]   * [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]]