This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Last revision Both sides next revision | ||
to-do_list [2023/09/22 12:48] swartzj [Setting up DAQ software] |
to-do_list [2023/10/19 17:12] swartzj |
||
---|---|---|---|
Line 7: | Line 7: | ||
* [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm) | * [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm) | ||
- | * Ensure that the object scintillator is in good conditions | + | * Ensure that the object scintillator is in good condition |
* [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]] | * [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]] |