User Tools

Site Tools


to-do_list

This is an old revision of the document!


Table of Contents

To-Do list

This section is aimed at helping the Device Physicist remember the list of things that need to be done prior to the S800 tuning.

In S3 vault

  • Ensure that the object scintillator is in good conditions and has enough shimming positions to withstand the expected rates during the course of the experiment. The guideline document describing the installation and shimming procedure can be accessed here
  • Make sure Intermediate PPACs have gas

In data U6

to-do_list.1445276146.txt.gz · Last modified: 2015/10/19 13:35 by pereira