This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
to-do_list [2015/10/20 13:56] pereira [In data U6] |
to-do_list [2023/10/19 17:15] (current) swartzj |
||
---|---|---|---|
Line 7: | Line 7: | ||
* [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm) | * [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm) | ||
- | * Ensure that the object scintillator is in good conditions | + | * Ensure that the object scintillator is in good condition |
* [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]] | * [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]] | ||
Line 19: | Line 19: | ||
* Make sure Intermediate PPACs have gas | * Make sure Intermediate PPACs have gas | ||
- | ===== In data U6 ===== | + | ===== In data U4 ===== |
- | * Start [[Software#u6pc5 (data U6)|Software applications]] (in computer | + | * Start [[Software#u4pc8 (data U4)|Software applications]] (in computer |
- | * Verify that **stagearea** in u6pc5 is pointing to the right place. After typing '' | + | ==== Setting up DAQ software ==== |
- | * Create a experiment directory in **/ | + | |
- | * Go to the newly created experiment directory, and create subdirectories **s800built**, | + | |
- | * Create the stagearea link by typing '' | + | |
- | * Run the S800 DAQ with multilogger enabled, and take some data on disk to ensure that the newly created stagearea is properly filled | + | |
+ | * For each experiment, an S800 Device Physicist will, after backing up whatever is to be backed up, install S800 DAQ and make it ready for the experiment. They do so as described in the following. | ||
- | * Make sure that scaler directory has the right experiment number: | + | === Backup any updates === |
- | * In a u6pc5 terminal, go to **/ | + | |
- | * If there is no directory for the current experiment, create one | + | |
- | * Run scalers in **/ | + | |
+ | * ~/ | ||
+ | * Compare files in the subdirectory Configurations (e.g. '' | ||
+ | * Manually add the modified files and commit the changes, and '' | ||
+ | |||
+ | === Uninstall existing files === | ||
+ | |||
+ | * '' | ||
+ | * '' | ||
+ | |||
+ | === Install existing files === | ||
+ | |||
+ | * '' | ||
+ | * The script should relink **stagearea** to the right place, provided that the proper experimental number is given. After typing '' | ||
+ | |||
+ | === Set S800 DAQ mode === | ||
+ | |||
+ | * Set S800 DAQ in [[s800 daq tools# | ||
+ | |||
+ | * Check [[s800 daq tools# | ||
+ | |||
+ | ===== Other items ===== | ||
* [[Turning magnets on/off#Set magnet currents individually |Put 10 Amps in Spectrograph dipoles]] | * [[Turning magnets on/off#Set magnet currents individually |Put 10 Amps in Spectrograph dipoles]] | ||
Line 44: | Line 59: | ||
* [[Magnetic-rigidity setting|Set spectrograph Brho]] (coordinate with experimenters) | * [[Magnetic-rigidity setting|Set spectrograph Brho]] (coordinate with experimenters) | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== At the end of the experiment ===== | ||
+ | * Verify with S800 Device Physicist that S800 DAQ software is uninstalled. This can be done by typing script '' | ||
+ | |||
+ | * Unbias detectors, CRDC interface boards, CRDCs gate, etc | ||
+ | |||
+ | * [[Gas handling system|Remove gas]] from CRDCs and Ion Chamber | ||