This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
venting_pumping_intermediate_image_box [2018/12/20 15:12] pereira [Filling/Removing gas in Intermediate-image delay PPAC] |
venting_pumping_intermediate_image_box [2018/12/20 15:15] pereira [Filling Intermediate-image delay PPAC with gas] |
||
---|---|---|---|
Line 98: | Line 98: | ||
* GH System status will indicate "Flow Estab." | * GH System status will indicate "Flow Estab." | ||
* I214BON_CONFIM will change to "PPAC BIAS ASSUMED ON" | * I214BON_CONFIM will change to "PPAC BIAS ASSUMED ON" | ||
- | * The valves status will be: V1 (open), V2 (closed), V3 (closed), V4 (open), V5 (closed), V6 (closed, I214V_NCL (enabled) | + | * The valves status will be: V1 (open), V2 (closed), V3 (closed), V4 (open), V5 (closed), V6 (closed), I214V_NCL (enabled) |
* You can now turn on the detectors | * You can now turn on the detectors | ||