This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Last revision Both sides next revision | ||
venting_pumping_lower-dipole_section_venting_pumping_lower-dipole_section [2023/10/12 09:01] noji Updated instructions for CS-Studio Phoebus |
venting_pumping_lower-dipole_section_venting_pumping_lower-dipole_section [2023/10/12 09:01] noji [Pumping analysis-line lower-dipole section] |
||
---|---|---|---|
Line 20: | Line 20: | ||
- After the section is vented (reached at atmospheric pressure), the vent valve should close automatically. | - After the section is vented (reached at atmospheric pressure), the vent valve should close automatically. | ||
- | ===== Pumping analysis-line lower-dipole section ===== | + | ===== Pumping-down analysis-line lower-dipole section ===== |
- The beamline gate valves D2436 BGV and D2542 BGV, the vent valve, the turbo gate valve, and the roughing valve (RV) should be all closed. The foreline valve (FV) should remain open. The ion gauge should remain turned off. The vacuum status should be red with "BAD VACUUM" | - The beamline gate valves D2436 BGV and D2542 BGV, the vent valve, the turbo gate valve, and the roughing valve (RV) should be all closed. The foreline valve (FV) should remain open. The ion gauge should remain turned off. The vacuum status should be red with "BAD VACUUM" |