This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
venting_pumping_object_box [2024/02/06 09:37] noji |
venting_pumping_object_box [2024/02/06 10:40] (current) noji |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Venting/ | ====== Venting/ | ||
- | ===== Vent Object chamber ===== | + | In CS-Studio/ |
- | + | ||
- | From the S800 Main Vacuum page, go to the Object chamber page, opening the page shown in the figure | + | |
{{: | {{: | ||
+ | |||
+ | ===== Vent Object chamber ===== | ||
The vent valve and the roughing valve RV should be closed when you begin. | The vent valve and the roughing valve RV should be closed when you begin. | ||
Line 11: | Line 11: | ||
The venting procedure is as follows: | The venting procedure is as follows: | ||
- Notify the Control Room and inform them that they can disregard the EXP alarm that will occur | - Notify the Control Room and inform them that they can disregard the EXP alarm that will occur | ||
+ | - Make sure that the detectors inside the chamber have been unbiased | ||
- Close the beamline gate valves D2341 BGV and D2303 BGV | - Close the beamline gate valves D2341 BGV and D2303 BGV | ||
- Turn off the IG | - Turn off the IG |