This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
venting_pumping_object_box [2018/04/25 17:43] pereira [Vent Object chamber] |
venting_pumping_object_box [2018/05/03 09:10] pereira |
||
---|---|---|---|
Line 16: | Line 16: | ||
* Turbo gate valve **I188GV** will be automatically closed | * Turbo gate valve **I188GV** will be automatically closed | ||
* Vent valve **I190VV** will be automatically opened. However, the pressure in the chamber (ass seen in **I191PG** will not change because we need to open the manual venting valve | * Vent valve **I190VV** will be automatically opened. However, the pressure in the chamber (ass seen in **I191PG** will not change because we need to open the manual venting valve | ||
- | | + | |
* When **I191PG** reads atmospheric pressure select the box "VENT STATUS" | * When **I191PG** reads atmospheric pressure select the box "VENT STATUS" | ||
* The status in the box "VENT STATUS" | * The status in the box "VENT STATUS" | ||
Line 23: | Line 23: | ||
{{: | {{: | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== Pumping Object chamber ===== | ||
+ | Requirements: | ||
+ | * Verify that Chamber is closed and that manual roughing pump valve located near the intermediate-image chamber is closed (see picture above) | ||
+ | * Verify that OBJ SCI is not biased by checking the HV module in dU6 | ||
+ | * Open **S800Vac** and go to page 01 (" | ||
+ | * Check " | ||
+ | * When the pressure in **I191PG** is below 100 mTorr, the Turbo Pump will start automatically through the following sequence: | ||
+ | * **I190RV** will be closed | ||
+ | * **I190FV** will be opened | ||
+ | * **I188GV** will be opened | ||
+ | * When the pressure ready by **I191PG** is few mTorr, you can turn on the ion gauge **I188IG**. Good vacuum will take ~30 minutes. | ||
+ | |||
+ |