User Tools

Site Tools


venting_pumping_object_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
venting_pumping_object_box [2018/04/25 17:44]
pereira [Vent Object chamber]
venting_pumping_object_box [2018/04/25 17:49]
pereira [Vent Object chamber]
Line 23: Line 23:
  
 {{:wiki:ventingvalveobjbox.jpg?300|Venting valve}} {{:wiki:ventingvalveobjbox.jpg?300|Venting valve}}
 +
 +
 +
 +
 +===== Pumping Object chamber =====
 +Requirements: PanelMate file **S800Vac**
 +  * Verify that Chamber is closed and that manual roughing pump valve located near the intermediate-image chamber is closed (see picture above)
 +  * Verify that OBJ SCI is not biased by checking the HV module in dU6  
 +  * Open **S800Vac** and go to page 01 ("Production Target Box Vacuum System sec 13")
 +  * Check "PUMPDOWN STATUS INTERMEDIATE BEAMLINE OBJECT BOX"; it should read "PUMPDOWN STOPPED". Select that box and click on "START PUMPDOWN"
 +  * When the pressure in **I191PG** is below 100 mTorr, the Turbo Pump will start automatically through the following sequence:
 +        * **I190RV** will be closed
 +        * **I190FV** will be opened
 +        * **I188GV** will be opened
 +  * When the pressure ready by **I191PG** is few mTorr, you can turn on the ion gauge **I188IG**. Good vacuum will take ~30 minutes.
 + 
 +
venting_pumping_object_box.txt ยท Last modified: 2024/02/06 10:40 by noji