This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
venting_pumping_object_box [2018/04/25 17:44] pereira [Vent Object chamber] |
venting_pumping_object_box [2024/02/06 09:37] noji |
||
---|---|---|---|
Line 2: | Line 2: | ||
===== Vent Object chamber ===== | ===== Vent Object chamber ===== | ||
- | Requirements: | ||
- | * Open **S800Vac** and go to page 01 (" | + | From the S800 Main Vacuum page, go to the Object chamber |
- | * Verify that OBJ SCI is not biased: | + | |
- | * Check that the detectors | + | {{:wiki: |
- | | + | |
- | * Isolate chamber by closing | + | The vent valve and the roughing valve RV should be closed when you begin. |
- | | + | |
- | | + | The venting procedure |
- | {{:wiki:objs800vac_pumped.jpg? | + | |
- | | + | |
- | * Box "VENT STATUS" | + | |
- | * Turbo gate valve **I188GV** | + | |
- | * Vent valve **I190VV** | + | - Monitor the pressure RBT_BTS31:BPG_D2337:VP_RD in a data browser |
- | * Go to the S800 OBJ station and slowly open the manual valve (see figure below). You can see the pressure | + | |
- | * When **I191PG** reads atmospheric pressure select | + | - When the pressure approaches ~800 Torr, close the venting |
- | * The status in the box "VENT STATUS" | + | |
- | * Close the manual | + | ===== Pumping Object chamber ===== |
- | * You can now open the chamber | + | |
+ | From S800 Vacuum Main Page, go to Object chamber page. This will open the page in the figure below. | ||
+ | | ||
+ | | ||
+ | * Open RV to start pumping down the object chamber with the roughing pump. You can make a plot of the pressure | ||
+ | * Section D2337 will initially be red with vacuum status: 'Bad vacuum' | ||
+ | * Wait until the vacuum reading at FPG to drops to below 200 mTorr before you can safely turn on the turbo pump. | ||
+ | * After turning on the turbo pump, wait for the inner circle of the pump symbol to turn green and the pump to reach 40 000 rpm before you open the valve at TGV. | ||
+ | * When the pressure decreases to below 10-3 Torr, you should see the pressure bottom out on your BPG plot, you can turn on the IG and also plot its pressure over time. Section D2337 should turn green and the vacuum status should turn to 'Good vacuum' | ||
- | {{: |