User Tools

Site Tools


venting_pumping_object_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
venting_pumping_object_box [2018/05/03 09:10]
pereira
venting_pumping_object_box [2020/04/01 21:32]
pereira [Vent Object chamber]
Line 11: Line 11:
   * [[Vacuum control|Turn off]] ion gauge **I188IG**    * [[Vacuum control|Turn off]] ion gauge **I188IG** 
   * Check box "PUMPDOWN STATUS BEAMLINE OBJECT BOX". It should read "Good vacuum"    * Check box "PUMPDOWN STATUS BEAMLINE OBJECT BOX". It should read "Good vacuum" 
 +  * Go to the S800 OBJ station and make sure that the manual valve (see figure below) is closed.
 +
 {{:wiki:objs800vac_pumped.jpg?500|S800vac Panel Mate}}.  {{:wiki:objs800vac_pumped.jpg?500|S800vac Panel Mate}}. 
   * In order to begin venting process, select box "VENT STATUS" and click "BEGIN VENTING PROCEDURE"   * In order to begin venting process, select box "VENT STATUS" and click "BEGIN VENTING PROCEDURE"
venting_pumping_object_box.txt ยท Last modified: 2024/02/06 10:40 by noji