User Tools

Site Tools


venting_pumping_object_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
venting_pumping_object_box [2020/04/01 21:32]
pereira [Vent Object chamber]
venting_pumping_object_box [2023/05/16 12:23]
swartzj
Line 6: Line 6:
   * Open **S800Vac** and go to page 01 ("Production Target Box Vacuum System sec 13")   * Open **S800Vac** and go to page 01 ("Production Target Box Vacuum System sec 13")
   * Verify that OBJ SCI is not biased:   * Verify that OBJ SCI is not biased:
-        * Check that the detectors is unbiased in the HV module sitting in dU6+        * Check that the detectors are unbiased in the HV module sitting in dU6
         * Notify the system of the bias-off state by selecting the "OBJ_SCI_HV CONFIRM" box and clicking "HV CONFIRM OFF"         * Notify the system of the bias-off state by selecting the "OBJ_SCI_HV CONFIRM" box and clicking "HV CONFIRM OFF"
   * Isolate chamber by closing gate valves **I177GV** and **I190GV**   * Isolate chamber by closing gate valves **I177GV** and **I190GV**
Line 17: Line 17:
         * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER", and then to "VENT VALVE OPEN"         * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER", and then to "VENT VALVE OPEN"
         * Turbo gate valve **I188GV** will be automatically closed         * Turbo gate valve **I188GV** will be automatically closed
-        * Vent valve **I190VV** will be automatically opened. However, the pressure in the chamber (ass seen in **I191PG** will not change because we need to open the manual venting valve+        * Vent valve **I190VV** will be automatically opened. However, the pressure in the chamber (as seen in **I191PG** will not change because we need to open the manual venting valve)
         * Go to the S800 OBJ station and slowly open the manual valve (see figure below). You can see the pressure rising in the Granville-Phillips 275 Mini-Convectron display located on top of the OBJ box.         * Go to the S800 OBJ station and slowly open the manual valve (see figure below). You can see the pressure rising in the Granville-Phillips 275 Mini-Convectron display located on top of the OBJ box.
         * When **I191PG** reads atmospheric pressure select the box "VENT STATUS" and click "STOP VENTING PROCESS"         * When **I191PG** reads atmospheric pressure select the box "VENT STATUS" and click "STOP VENTING PROCESS"
venting_pumping_object_box.txt ยท Last modified: 2024/02/06 10:40 by noji