Line 7: Line 7:
 {{:wiki:screenshot_from_2024-02-06_09-20-58.png|}} {{:wiki:screenshot_from_2024-02-06_09-20-58.png|}}
  
-The vent valve should also be closed when you begin. Before you start venting, make sure of the following:     +The vent valve and the roughing valve RV should be closed when you begin. 
-  * The beamline gate valves D2341 BGV and D2303 BGV are closed +
-  * The IG is off +
-  * The roughing valve RV is closed. +
-  * The turbo pump gate valve TVG is closed. If the chamber will be vented for a long time, the turbo pump should be switched off +
  
 The venting procedure is as follows:  The venting procedure is as follows: 
 +  - Notify the Control Room and inform them that they can disregard the EXP alarm that will occur
 +  - Close the beamline gate valves D2341 BGV and D2303 BGV
 +  - Turn off the IG
 +  - Close the turbo pump gate valve TVG. If the chamber will be vented for a long time, the turbo pump should be switched off
   - Monitor the pressure RBT_BTS31:BPG_D2337:VP_RD in a data browser   - Monitor the pressure RBT_BTS31:BPG_D2337:VP_RD in a data browser
   - Open the vent valve    - Open the vent valve 