User Tools

Site Tools


venting_pumping_object_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
venting_pumping_object_box [2018/04/25 17:28]
pereira
venting_pumping_object_box [2020/04/01 21:32] (current)
pereira [Vent Object chamber]
Line 11: Line 11:
   * [[Vacuum control|Turn off]] ion gauge **I188IG**    * [[Vacuum control|Turn off]] ion gauge **I188IG** 
   * Check box "PUMPDOWN STATUS BEAMLINE OBJECT BOX". It should read "Good vacuum"    * Check box "PUMPDOWN STATUS BEAMLINE OBJECT BOX". It should read "Good vacuum" 
 +  * Go to the S800 OBJ station and make sure that the manual valve (see figure below) is closed.
 +
 {{:wiki:objs800vac_pumped.jpg?500|S800vac Panel Mate}}.  {{:wiki:objs800vac_pumped.jpg?500|S800vac Panel Mate}}. 
   * In order to begin venting process, select box "VENT STATUS" and click "BEGIN VENTING PROCEDURE"   * In order to begin venting process, select box "VENT STATUS" and click "BEGIN VENTING PROCEDURE"
-        * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER" +        * Box "VENT STATUS" should change from "VENT PROCEDURE STOPPED" to "WAITING FOR VENT TIMER", and then to "VENT VALVE OPEN" 
-        * Turbo gate valve **I214GV** will be automatically closed and pressure in chamber will start rising (as seen in **I215PG**) {{:wiki:iis800vac_startventing.jpg?500|S800vac Panel Mate: start venting}}.  +        * Turbo gate valve **I188GV** will be automatically closed 
-        * When **I215PG** reads atmospheric pressureselect the box "VENT STATUS" and click "STOP VENTING PROCESS". {{:wiki:iis800vac_stopventing.jpg?500|S800vac Panel Mate: stop venting}}.  +        * Vent valve **I190VV** will be automatically opened. However, the pressure in the chamber (ass seen in **I191PG** will not change because we need to open the manual venting valve 
- +        * Go to the S800 OBJ station and slowly open the manual valve (see figure below). You can see the pressure rising in the Granville-Phillips 275 Mini-Convectron display located on top of the OBJ box
-        * The status in the box "VENT STATUS" should change from "WAITING FOR VENT TIMER" to "VENT PROCEDURE STOPPED"+        * When **I191PG** reads atmospheric pressure select the box "VENT STATUS" and click "STOP VENTING PROCESS" 
 +        * The status in the box "VENT STATUS" should display "VENT PROCEDURE STOPPED" and the vent valve **I190VV** should be automatically closed 
 +        * Close the manual valve
         * You can now open the chamber         * You can now open the chamber
  
 +{{:wiki:ventingvalveobjbox.jpg?300|Venting valve}}
 +
 +
 +
 +
 +===== Pumping Object chamber =====
 +Requirements: PanelMate file **S800Vac**
 +  * Verify that Chamber is closed and that manual roughing pump valve located near the intermediate-image chamber is closed (see picture above)
 +  * Verify that OBJ SCI is not biased by checking the HV module in dU6  
 +  * Open **S800Vac** and go to page 01 ("Production Target Box Vacuum System sec 13")
 +  * Check "PUMPDOWN STATUS INTERMEDIATE BEAMLINE OBJECT BOX"; it should read "PUMPDOWN STOPPED". Select that box and click on "START PUMPDOWN"
 +  * When the pressure in **I191PG** is below 100 mTorr, the Turbo Pump will start automatically through the following sequence:
 +        * **I190RV** will be closed
 +        * **I190FV** will be opened
 +        * **I188GV** will be opened
 +  * When the pressure ready by **I191PG** is few mTorr, you can turn on the ion gauge **I188IG**. Good vacuum will take ~30 minutes.
 + 
  
venting_pumping_object_box.1524691719.txt.gz · Last modified: 2018/04/25 17:28 by pereira