User Tools

Site Tools


venting_pumping_vacuum_sections_in_s800

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
venting_pumping_vacuum_sections_in_s800 [2017/06/13 11:50]
pereira created
venting_pumping_vacuum_sections_in_s800 [2023/02/13 14:45] (current)
noji Change to the title of the linked page.
Line 1: Line 1:
 ====== Venting/pumping vacuum sections in S800 ====== ====== Venting/pumping vacuum sections in S800 ======
 +Details about the Vacuum and Vacuum control system can be found [[Vacuum control|here]]. During preparation of an experiment, some of the vacuum sections need to be vented/pumped due to different reasons (install/replace new detector, align target with telescope, etc.). In this section, we provide guidelines to vent/pump the different sections of the S800 beamline and spectrograph that are most frequently used.
  
- +  * [[Venting/pumping Object box|Venting/pumping Object box]] 
- +  * [[Venting/pumping upper-dipole section/Venting/pumping upper-dipole section|Venting/pumping upper-dipole section]]
- * [[Installation FP SCI|Opening/closing (venting/pumping) FP box]]+
   * [[Venting/pumping Intermediate Image box|Venting/pumping Intermediate Image box and filling PPACs with gas]]   * [[Venting/pumping Intermediate Image box|Venting/pumping Intermediate Image box and filling PPACs with gas]]
 +  * [[Venting/pumping lower-dipole section/Venting/pumping lower-dipole section|Venting/pumping lower-dipole section]] 
 +  * [[Installation FP SCI|Venting/pumping/opening/closing FP box and filling CRDCs & IC with gas]]
venting_pumping_vacuum_sections_in_s800.1497369000.txt.gz · Last modified: 2017/06/13 11:50 by pereira