Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
daq:daq [2012/10/17 11:26]
recchia [DAQ cold restart]
daq:daq [2015/09/10 09:03]
weisshaa [DAQ Setup 2015]
Line 1: Line 1:
-GRETINA ​DAQ system+======= This is DAQ page for the 2015 campaign ====== 
 +The DAQ page from the former S800-GRETINA campaign in 2012 can be found at 
 +https://​wikihost.nscl.msu.edu/​gretina/​doku.php/​daq:​daq_2012
  
-====== ​HowTo for experimenter in charge ========+====== ​DAQ Setup 2015 ======
  
-  * Online SpecTcl [[:onlinespectcl|onlinespectcl]]+  * Q5P4 Seg 31 values are negative. Appears to be problem with digitizer. 
 +  * Q5P1 can not be in trigger. 
 +  * Run 106 - Taken with north hemisphere. ​ All detectors biased to 3000 V.  Q1 Q2 Q6 Q8 all in trigger. Before full voltage benchmark run. 
 +  * North Hemisphere Hole map  
 +    
 +^  Quad  ^  Hole  ^  
 +^  Q1  | 24 | 
 +^  Q2  |  29 | 
 +^  Q6  | 9 | 
 +^  Q8  |  28 |
  
-====== Changelog ======== +  ​Q1 -> Hole 24, Q2 -> Hole 29, Q6 -> Hole 9, Q8 -> Hole 28 
-ANY change to the DAQ system out here: [[:​daqchange|daqchange]] +  ​* South Hemisphere Hole map  
- +
-**NOTE**: No change pass July 13th 2012 can be done without explicit +
-announcement and approval (by Dirk).  +
- +
- +
-====== issues ======== +
-ANY issue/​breakdown put here: [[:​daqtrouble|daqtrouble]] +
- +
- +
-ReadOutShell reports "S800 changed to inactive"​ [[:​ReadOutShellS800Inactive|ReadOutShellS800Inactive]] +
- +
-====== start procedures ====== +
- +
-  * [[GRETINA:​GRETINA]] +
-  *[[s800daq:​s800daq]] +
-  *[[source measurement:​source measurement]] +
-  * S800 monitor [[https://​groups.nscl.msu.edu/​opdevtech/​wiki/​index.php/​S800_DAQ_status_tool|S800mon]] +
- +
-====== Documentation ====== +
-  * NSCL DAQ general [[http://​docs.nscl.msu.edu/​daq]] +
-  * NSCL DAQ GRETINA (ReadOutShell scheme) [[http://​docs.nscl.msu.edu/​daq/​gretinauserdocs.pdf]] +
-  * S800 DAQ [[https://​groups.nscl.msu.edu/​opdevtech/​wiki/​index.php/​Main_Page#​Electronics_and_DAQ]] +
- +
-====== Trigger connection ====== +
- +
-  * [[daq:​triggerconnection|Trigger connection (Card 29)]] +
- +
- +
-====== Status ====== +
-[[:​status|status]] +
- +
- +
- +
-==== Files/trees on GRETINA cluster to go ==== +
-(Only to be done by Dirk) +
- +
-   /​global/​data1x/​gretina:​  +
-   ​drwxrwxr-x  64 gretina users  4096 Sep 19  2011 CR-+
-   ​drwxrwxr-x 528 gretina users 20480 Oct  4  2011 CR-2 +
-   drwxrwxr-x ​ 12 gretina users  4096 Nov 16  2011 CR-5+
        
-   /​global/​data1b/​gretina + Quad   Hole   
-   ​2.7T CR-9 + Q3  17  ​| 
- + Q5   25 | 
-==== File Structure on GRETINA cluster / files to be kept ==== + Q7   19 |
- +
-   Here offline decomp data gets stored: +
-    /​global/​data1a/​gretina/​user1 +
-    /​global/​data1a/​gretina/​user2 +
-    /​global/​data1a/​gretina/​user2_1 +
-    /​global/​data1a/​gretina/​user4 +
- +
-   Base + data to create them: +
-   /​global/​data1a/​ +
-   ​drwxrwxrwx ​ 8 mario   ​bin ​  4096 Mar 27 12:52 q1a1 +
-   ​drwxr-xr-x ​ 6 mario   ​bin ​  4096 Nov 24  2010 q1a3 +
-   ​drwxrwxrwx ​ 9 mario   ​bin ​  4096 Mar 27 12:53 q1b1 +
-   drwxr-xr-x ​ 7 mario   ​bin ​  4096 Mar 27 12:53 q1b2 +
-   ​drwxr-xr-x ​ 9 mario   ​bin ​  4096 Mar 27 12:55 q2a5 +
-   ​drwxr-xr-x ​ 9 mario   ​bin ​  4096 Mar 27 12:57 q2a6 +
-   ​drwxrwxrwx ​ 7 mkp     ​bin ​  4096 Mar 27 13:01 q2b4 +
-   ​drwxr-xr-x ​ 7 mkp     ​bin ​  4096 Mar 27 13:03 q2b6 +
-   ​drwxr-xr-x ​ 5 mario   ​bin ​  4096 Mar 27 13:05 q3a14 +
-   ​drwxr-xr-x ​ 6 mario   ​bin ​  4096 Mar 27 13:06 q3a7 +
-   ​drwxr-xr-x ​ 5 mario   ​bin ​  4096 Mar 27 13:08 q4a4 +
-   ​drwxr-xr-x ​ 5 mario   ​bin ​  4096 Mar 27 13:09 q4a8 +
-   ​drwxr-xr-x ​ 5 mario   ​bin ​  4096 Mar 27 13:11 q4b7 +
-   ​drwxr-xr-x ​ 6 mario   ​bin ​  4096 Mar 29 14:00 q4b8 +
-   /​global/​data1b/​ +
-   ​drwxr-xr-x ​ 5 mario   ​bin ​  4096 Mar 27 14:26 q3b14 +
-   ​drwxr-xr-x ​ 5 mario   ​bin ​  4096 Mar 27 14:27 q3b5 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Mar  6 18:07 q5a10 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Mar  6 18:17 q5a12 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Mar  7 13:14 q5b10 +
-   drwxr-xr-x ​ 5 gretina bin   4096 Mar  6 18:27 q5b3 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Mar 27 14:29 q6a15 +
-   drwxr-xr-x ​ 5 gretina bin   4096 Mar 27 14:29 q6a3 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Jun 10  2011 q6b11 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Jun 10  2011 q6b9 +
-   ​drwxr-xr-x ​ 3 gretina bin   4096 Mar 27 14:31 q7a11 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Mar 27 14:32 q7a9 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Mar 27 14:33 q7b13 +
-   ​drwxr-xr-x ​ 5 gretina bin   4096 Mar 27 14:33 q7b15 +
-   ​384G DNLapril2012: ​  DNL data of digitizers +
- +
-====== Configuration files for decompostion ====== +
-The configuration for the decomposition is here: https://​wikihost.nscl.msu.edu/​gretina/​doku.php/​daq:​decomp +
- +
-====== Positioning of the quads ====== +
-When a position of a detector is changed the following has to be updated: +
-  * CS_DataId in https://​wikihost.nscl.msu.edu/​gretina/​doku.php/​daq:​decomp +
-  * CS_GblId in /​global/​devel/​boot/​vmeArray/​vme*.cmd --- The Id is given by  hole_number * 16 + position_in_quad * 4 + board_number +
-  * GTSort_shack/​DetNum.dat --- self explanatory +
- +
-====== How to replace a broken node with a spare one ====== +
-To replace a node of the cluster (e.g. n000x) with a spare one (e.g. n000y) follow the following procedure:​ +
-In the file /​global/​devel/​gretTop/​11-1/​gretClust/​bin/​linux-x86/​setup7modulesRaw.sh and in the file /​global/​devel/​gretTop/​11-1/​gretClust/​bin/​linux-x86/​setupEndtoEnd28.sh +
-  * replace node000x_CS_Program?​ with node000y_CS_Program?​ +
-  * from the "​GRETINA CLUSTER node allocation"​ window identify the name of the Decomp process (middle click on the crystal number) and replace it in the files +
-  * change the n000x to offline and the n000y to online using the variables Decomp???​_CS_Enable +
- +
- +
-====== DAQ cold restart ====== +
-  * Switch off all the vme crates. +
-  * wait 30 s +
-  * Switch on the vme crate of the trigger cards. +
-  * wait till the red lights over the trigger board are on (~ 3 minutes) +
-  * Switch on all the other vme crates +
-  * wait till the green blinking lights appears on all the digitizers (~ 3 minutes) +
-  * start the daq and check the synchronization (alarm window or TS window). If few of the digitizers are out of sync recover them using the "​reboot IOCs button",​ otherwise power-cycle on their crate+
  

QR Code
QR Code daq:daq (generated for current page)