Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
daq:daq [2015/09/04 12:07] belarge [DAQ Setup 2015] |
daq:daq [2015/12/04 09:31] weisshaa [Gretina Computing] |
||
---|---|---|---|
Line 2: | Line 2: | ||
The DAQ page from the former S800-GRETINA campaign in 2012 can be found at | The DAQ page from the former S800-GRETINA campaign in 2012 can be found at | ||
https://wikihost.nscl.msu.edu/gretina/doku.php/daq:daq_2012 | https://wikihost.nscl.msu.edu/gretina/doku.php/daq:daq_2012 | ||
+ | |||
+ | * S800-Gretina control [[docsS800Grt|docsS800Grt]] | ||
+ | |||
+ | ======= Troubleshoot ====== | ||
+ | * S800-Gretina not correlated: Check CC setfile ~s800/converged_daq/Scripts/CC0105Begin.tcl for extsynch and extclock | ||
+ | |||
+ | ======= Gretina Computing ======= | ||
+ | Gretina computer farm is maintained by LBNL computer group and local NSCL IT department. Nonetheless I put documents here, but we do NOT do anything to the GRETINA computers! | ||
+ | |||
+ | * Instruction to shut down switches for NSCL power shutdown 12/5/2015 {{:daq:gretinaswitchesshutdown.pdf|}} | ||
+ | ======= Misc 2015 ====== | ||
+ | * Dual homed NSCL machines are ddasdaq2 and ddasdaq3 | ||
====== DAQ Setup 2015 ====== | ====== DAQ Setup 2015 ====== | ||
- | * Q5P4 Seg 31 values are negative. Appears to be problem with digitizer. | + | |
- | * Q5P1 can not be in trigger. | + | |
- | * Run 106 - Taken with north hemisphere. All detectors biased to 3000 V. Q1 Q2 Q6 Q8 all in trigger. Before full voltage benchmark run. | + |