Line 3: | Line 3: | ||
https://wikihost.nscl.msu.edu/gretina/doku.php/daq:daq_2012 | https://wikihost.nscl.msu.edu/gretina/doku.php/daq:daq_2012 | ||
- | ====== DAQ Setup 2015 ====== | + | * S800-Gretina control [[docsS800Grt|docsS800Grt]] |
- | * Q5P4 Seg 31 values are negative. Appears to be problem with digitizer. | + | ======= Troubleshoot ====== |
- | * Q5P1 can not be in trigger. | + | * S800-Gretina not correlated: Check CC setfile ~s800/converged_daq/Scripts/CC0105Begin.tcl for extsynch and extclock |
- | * Run 106 - Taken with north hemisphere. All detectors biased to 3000 V. Q1 Q2 Q6 Q8 all in trigger. Before full voltage benchmark run. | + | |
- | * North Hemisphere Hole map : | + | |
- | + | ||
- | ^ Quad ^ Hole ^ | + | |
- | ^ Q1 | 24 | | + | |
- | ^ Q2 | 29 | | + | |
- | ^ Q6 | 9 | | + | |
- | ^ Q8 | 28 | | + | |
- | * Q1 -> Hole 24, Q2 -> Hole 29, Q6 -> Hole 9, Q8 -> Hole 28 | + | ======= Decomp Information ====== |
- | * South Hemisphere Hole map | + | * [[easy_decomp_calibrations|Easy Gretina Decomp File Creation]] |
- | + | * [[decomp_calibrations|Gretina Decomp Calibrations Explanation]] | |
- | ^ Quad ^ Hole ^ | + | |
- | ^ Q3 | | | + | |
- | ^ Q5 | 25 | | + | |
- | ^ Q7 | 19 | | + | |
+ | ======= Gretina Computing ======= | ||
+ | Gretina computer farm is maintained by LBNL computer group and local NSCL IT department. Nonetheless I put documents here, but we do NOT do anything to the GRETINA computers! | ||
+ | |||
+ | * Instruction to shut down switches for NSCL power shutdown 12/5/2015 {{:daq:gretinaswitchesshutdown.pdf|}} | ||
+ | ======= Misc 2015 ====== | ||
+ | * Dual homed NSCL machines are ddasdaq2 and ddasdaq3 | ||
+ | |||
+ | ====== miscellaneous ====== | ||
+ | * Validation/Trigger window width is set by Dig116_CS_X55WidthP, Dig116_CS_X55WidthN. N/P stands for positive/negative maximum difference relative to Trigger timestamp which will be read out. | ||
+ | * Bringing up just the EPICs screen: in gretina home **./startGRETINA_EPICSdisplay** | ||
+ | * Set trigger multiplicity: **caput Trig0_CS_FSCThr n** (n=0,1,2,3... for mult 1,2,3,4...) | ||
+ | * See trigger pulse width: **CheckLED.sh** | ||
+ | * Change trigger pulse width: **SETLEDWIN <# of 20ns ticks>** | ||
+ | * Check timestamps, report boards that are out-of-sync: **CheckTS** | ||
+ | * Force timestamps to reset, DO NOT USE DURING RUN!!!: **SINGLEIMPSYNC** | ||
+ | * Warning script: run on a2 as gretina in ~/scripts: **./warningMessage4.sh ** |