Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
fillsystem:fillsystem [2019/12/30 10:50]
weisshaa [part numbers (also liquid cooling)]
fillsystem:fillsystem [2020/07/09 12:42]
weisshaa
Line 1: Line 1:
 ==GRETINA LN filling system== ==GRETINA LN filling system==
  
-====== Status (Feb 2016) ======+==== PT 100 shack === 
 +det 0 (shack PT100) (Dewar PT100 ovl) (wall manifold PT100) 
 +det29 (shack AC vent PT100) (shack PT100) (?) 
 + 
 +====== Status (July 2019) ======
 LN supply ON (valve 2 in wall manifold) is c0.2/relay #1, i.e. open main supply to GRETINA with opv 1 LN supply ON (valve 2 in wall manifold) is c0.2/relay #1, i.e. open main supply to GRETINA with opv 1
  

QR Code
QR Code fillsystem:fillsystem (generated for current page)