Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
run:list [2012/06/13 16:27]
recchia
run:list [2020/08/04 14:28] (current)
weisshaa [Run lists campaign 2019/20]
Line 1: Line 1:
   * 152Eu source sheet {{:​run:​z2707-1.pdf|}}   * 152Eu source sheet {{:​run:​z2707-1.pdf|}}
 +  * source yields {{:​run:​sourceyieldsiaea.pdf|}} {{:​run:​sourceyieldsiaea.xls|}}
  
 validate: Channels which triggered get written validate: Channels which triggered get written
  
-TTCS: All 40 channels of a triggering crystal get written+TTCS (Trigger Timing Control System): All 40 channels of a triggering crystal get written
  
 in Run directory, file Setpoints: CryG_CS_BRE is status of baseline restorer in Run directory, file Setpoints: CryG_CS_BRE is status of baseline restorer
  
-^  date    ^  directory ​  ​^ ​ run    ^  Description ​                                           ^ +==== Run lists campaign 2019/20 ==== 
-|  6/​1/​12 ​ |  data1b/​MSUMay2012 ​ |  37     | 60Co validate ​ | +  ​* [[Phantom2020:​Phantom2020|Phantom2020]] ​(Phantom and 12 quads
-|          |              |  38     | 60Co TTCS      | +  ​* [[MSUJan2020:​MSUJan2017|MSUJan2020]] ​(sources and 12 quads
-|          |              |  46     | 152Eu+60Co, 4kHz/xtal, mode 3  | + 
-|          |              |  50     | 56Co, Mode 2+3, 1.5Mb/s, dt 92%  | +
-|          |              |  55     | 56Co, mode 2,3                   | +
-|          |              |  56     | 56Co, mode 2  | +
-|          |              |  57     | 56Co, mode 2+3 | +
-|          |              |  58     | 56Co, mode 3, TTCS  | +
-|          |              |  59     | 56Co, mode 3, validate, trace 2us  | +
-|          |              |  60     | 56Co, mode 3, validate, trace 0.2us | +
-|          |              |  61     | 60Co 10uCi, mode 3, validate, trace 0.2us | +
-|          |              |  62     | 60Co, mode 3, validate, trace 2us  | +
-|          |              |  63     | 60Co, mode 3, TTCS   | +
-|          |              |  64     | 60Co, mode 2+3  | +
-|          |              |  65     | 60Co, mode 2  | +
-|          |              |  66     | 152Eu, mode 2  | +
-|          |              |  67     | 152Eu, mode 2+3  | +
-|          |              |  68     | 152Eu, mode 3, TTCS  | +
-|          |              |  69     | 152Eu, mode 3, validate, 2us  | +
-|          |              |  70     | 152Eu, mode 3, validate, 0.2us | +
-|          |              |  71     | 226Ra, mode 3, validate, 0.2us | +
-|          |              |  72     | 226Ra, mode 3, validate, 2us traces ​ | +
-|          |              |  73     | 226Ra, mode 3, TTCS  | +
-|          |              |  74     | 226Ra, mode 3  | +
-|          |              |  75     | 226Ra, mode 2  | +
-^          ^              ^         ​^ ​                                                        ^ +
-|  6/​4/​12 ​ |  data1b/​MSUMay2012 ​ |  84     | calibration works, low rate 60Co, mode 2+3              | +
-|          |              |  85     | low rate 60Co, 2+3  | +
-|          |              |  87     | 226Ra, mode 3 validate, 2us traces ​ | +
-|          |              |  89     | 226Ra, mode 3 validate, 2us traces | +
-|          |              |  92     | 226Ra, mode 3 validate, 2us traces | +
-|          |              |  94     | 226Ra, mode 3 validate, 2us traces | +
-|          |              |  101    | switched to Gretina+S800,​ TTCS, mode 2+3       | +
-|          |              |  102    | 60Co mode 2+3  | +
-|          |              |  105    | 60Co, downscaler 10, crystal 5000Mb/​sec ​ | +
-|          |              |  107    | 60Co, d/s 5 | +
-|          |              |  110    | 60Co, d/s 3 | +
-|          |  data1a/​MSUJune2012 |    7     | 60Co, d/s 1, 8000Mb/sec, 18% DT |  +
-^          ^              ^         ​^ ​                                                        ^ +
-|  6/​5/​12 ​ |  data1a/​MSUJune2012 |    10  | 5Mev range in mode 2+3, 60Co weak, d/s 10  |  +
-|          |                     ​| ​   12  | 5MeV range in mode 2+3, 152Eu at center, d/s 10, BLR off | +
-|          |                     ​| ​   13  | 5MeV, mode 2+3, 152Eu center, d/s 5, BLR off  | +
-|          |                     ​| ​   14  | mode 3 validate, 0.2us trace, 152Eu center, d/s 10, BLR off  | +
-|          |                     ​| ​   15  | mode 3 validate, 0.2us trace, 152Eu center, d/s 10, BLR off, HEMIs closed! ​ | +
-|          |                     ​| ​   16  | mode 2+3, 152Eu center, d/s 10, BLR off, HEMIs closed! ​ | +
-|          |                     ​| ​   17  | mode 2+3, 60Co (weak) center, d/s 10, BLR off, HEMIs closed! ​ | +
-|          |                     ​| ​   23  | mode 3 validate, 0.2us, 60Co (weak) center, d/s 10, BLR off, HEMIs closed! ​ | +
-|          |                     ​| ​   24  | mode 3 validate, 0.2us, 60Co (weak) center, d/s 10, BLR off, HEMIs open!  | +
-|          |                     ​| ​   25  | mode 2+3, 60Co (weak) center, d/s 10, BLR off, HEMIs open!  | +
-|          |                     ​| ​   27  | mode 2+3, no source, d/s 1, BLR off, HEMIs closed! ​ | +
-^          ^              ^         ​^ ​                                                        ^ +
-|  6/​6/​12 ​ |  data1a/​MSUJune2012 |    28  | mode 2+3, no source, d/s 1, BLR off, HEMIs open!  | +
-^          ^              ^         ​^ ​  FROM HERE ON S800 SYNCHRONIZATION SET UP WRONG (most likely) ​  ^ +
-|          |                     ​| ​   59  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20, most likely S800 did run with internal clock since then -> no '​obvious'​ correlation | +
-|          |                     ​| ​   60  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​   61  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​   62  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​   63  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​   65  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-^          ^              ^         ​^ ​                                                        ^ +
-|  6/​7/​12 ​ |  data1a/​MSUJune2012 |    67  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​   69  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20, fill during ​Run +
-|          |                     ​| ​   70  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​   71  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​   72  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-^          ^              ^         ​^ ​                                                        ^ +
-|  6/8/12  |  data1a/​MSUJune2012 |    73  | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-|          |                     ​| ​  ​108 ​ ​| ​mode 2only Decomp 1-28, sendRaw 29 (TTCSfor LaBr, or Gretina | +
-|          |                     ​| ​  ​110 ​ ​| ​mode 2only Decomp 1-28, sendRaw 29 (TTCSfor LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-^          ^              ^         ​^ ​ HERE WE SET THE S800 SYNCHRONIZATION CHECK BUTTON PROPERLY ​ ^ +
-|          |                     ​| ​  ​130 ​ | mode 3 TTCS + LaBr, coinc or Gretina ds 50 or LaBr ds 20 | +
-^          ^              ^         ​^ ​                                                        ^ +
-|  6/​9/​12 ​ |  data1a/​MSUJune2012 |   ​162 ​ | mode 3 TTCS, or Gretina with ~ 1 MeV threshold, "Super Pulse" measurement,​ IOC of CRY#7 failed after 2 hours | +
-|  6/10/12 |  data1a/​MSUJune2012 |   ​165 ​ | mode 3 TTCS, or Gretina with ~ 1 MeV threshold, "Super Pulse" measurement,​ CRY#7 only | +
-^          ^              ^         ​^ ​ QUADS MOVED TO THE FINAL CONFIGURATION. Q2 and Q5 are not swapped any more    ^ +
-|  6/13/12 |  data1a/​MSUJune2012 |   ​171 ​ | mode 3 Validate 0.2 us 60Co only Q1 Q2 Q3 with old positions |+
  
 +==== Run lists campaign 2015 ====
 +  * [[MSUJune2017:​MSUJune2017]] (Phantom in GRETINA)
 +  * [[MSUMay2017:​MSUMay2017]] (long 152Eu)
 +  * [[MSUFeb2017:​MSUFeb2017]] ​
 +  * [[MSUJuly2016:​MSUJuly2016]] ​ (LH configuration)
 +  * [[MSUMay2015:​MSUMay2015]] ​ (2016  !!!)
 +  * [[MSUNov2015:​MSUNov2015]] ​
 +
 +==== Run lists campaign 2012 ====
 +  * [[MSUMay2012:​MSUMay2012]] **GONE**
 +  * [[MSUJune2012:​MSUJune2012]]
 +  * [[MSUTestBeam_June2012:​MSUTestBeam_June2012]] **BACKUP /​evtdata/​gretinadaq/​MSU_all**
 +  * [[MSU_UpdateJune25th:​MSU_UpdateJune25th]] **Purged**
 +  * [[MSUTestBeam_June2012_II:​MSUTestBeam_June2012_II]] **BACKUP /​evtdata/​gretinadaq/​MSU_all**
 +  * [[MSU_UpgradeJuly_1:​MSU_UpgradeJuly_1]] **Purged**
 +  * [[MSU_UpgradeJuly_II:​MSU_UpgradeJuly_II]] **Purged**
 +  * [[MSU_EffSep2012:​MSU_EffSep2012]] Efficiency measurement
 +  * [[MSU_EffDec2012:​MSU_EffDe2012]] Efficiency measurement
 +  * [[MSU_January2013_DAQtests:​MSU_January2013_DAQtests]] X-talk measurements
 +  * [[MSU_EffMar2013:​MSU_EffMar2013]] Efficiency measurement
 +  * [[MSU_EffApril2013:​MSU_EffApril2013]] Efficiency measurement with LiqH2 configuration
 +  * [[MSU_LHcal_April2013:​MSU_LHcal_April2013]] Efficiency measurement with LiqH2 beam pipe/target removed
 +  * [[MSU_April2013_deadtime:​MSU_April2013_deadtime]] Measurements for understanding deadtime in GRETINA/​S800
 +  * [[MSU_May2013_LH:​MSU_May2013_LH]] LH beam pipe without LH target
 +  * [[MSU_May2013_90deg:​MSU_May2013_90deg]] all quads at 90 degree
  

QR Code
QR Code run:list (generated for current page)