====== e10011 Experiment:===== ===== To do list: ===== (as of 6/16) - X Modify the PA box parts (Western) - X Assemble PA box and test preamps (Western + NSCL) - New CsI cables (NSCL) - Craig Snow working on drawings - X Mount dEs on HiRA telescopes (NSCL, WashU) - X Set up 4th motherboard (NSCL) - X Move HiRA telescopes downstream in s2 chamber (e08001 configuration) (NSCL, Western) - X Cable HiRA (including dE's - it may require making few new cables; some of the old cables can be reused) (NSCL, Western) - during site visit - X Test all 4 MBs and PA box with a pulser (NSCL) - Alpha calibration for dEs (NSCL) - bad dE currently being replaced by Zibi and Lee - Software (expand daq software and spectcl to read dEs) (NSCL) - new histograms need to be made for online analysis - X Trigger (changes required to read and trigger on dEs) (NSCL, WashU) - Multiplexer - Scalers (add in dEs) - Beam blocker (installation) {{:cable_connector.pdf|}}