=====Meeting Minutes February 17, 2012===== ===Present=== Bill, Betty, Dan, Mike, Zibi, Rachel, Suwat, Jack, Bec ====Group Business==== * Betty: Lab moving: Asbestos in 124, abating floor. Don't go in there. Some more delay in moving, no updates to schedule * Experiment: nothing scheduled yet, probably not running until summer at earliest * Zibi: preamp box for Lee's exp: use one that was on top of the S800 chamber? Need a stand/small table? * FYI: chipboards from Jack's experiment are at Wash U right now * Micron detector: is the cable right? Dan/Mike will check. * Bec: Miniball box: new rails (48") will cost $250. For now we'll put in the rails from Oct 2011 experiment and plan to buy new ones when we need them * Rachel: creating a link on wiki for Future HiRA Purchases ====Efficiency Program (Jack)==== * Current status of efficiency program: "pixel" refers to HiRA/LASSA, "bin" refers to root plotting - plots pixels from data - For every pixel hit generate 100 random hits spread across the pixel. - suppress any multiple hit in a single bin - Project to 1D in theta: calculates the fraction of solid angle hit in the theta range chosen * Betty suggests not randomizing: subdivide the bins evenly, put 1 hit into each, then project ====Updates==== * Mike: pT vs rapidity for isotopes (p,d,t,3He,alpha). Also plotting cross-sections dM/dEdOmega including lab efficiency for protons, Bill suggests putting all into one plot. * Rachel should copy this method and attempt for her data * Dan: putting together multi-hit events in neutron walls, trying to see what events did not make the cut. High reject rate in Wall 0 at 120 MeV. When include the PID gates as part of the cut determination, lowers the rejection rate... by a lot. Next step will cut on less overlap with the proton vetoes, should clean up some but not as much.