=====Minutes January 27, 2012===== ===Present=== Mike, Rachel, Suwat, Zibi, Jack, Bec, Betty, Bill Dan--very late! Maybe moving group meeting to accommodate new schedule. ====Group Business==== * HiRA boxes: Jimmy is working on cleaning the parts, should finish next week. Then he'll re-make one and show Bill and Betty * Si E's were ordered for the new telescopes, have enough CsI crystals * Lab moving: repair 124 by mid-February and moving crane over. Do we need a crane in 127? After we move in, maybe * Discussion on N111, 127 plans * N111: miniball display: Shop suggested they have extra I-beams, we could make a table. Bill suggests a table on wheels. * 127: Need to remeasure the test chamber, TPC, door to make sure we have enough room ====Computer Committee Update==== * Moved to ring buffers * S800 SpecTcl: moving away from the old multicolor gui * S800 Apple computer moving from Data U ====Updates==== * Dan: Statistics for PV vs. NW within cuts. Meaningful data for single-hit, now moving to multi-hit * Zibi: Transverse flow paper for BUU calculations. Will look at energy dependence on efficiency next week * Bec: TPC: detector designs, WMU has laser system designed. For Tilak's exp: talking with Jeff Tostevin to fix up TWOFNR * Jack: time-stamped files merged for 07038. A few won't merge (<1%) but looking into it. * Rachel: t/3He energy spectra, broken up by CsI. Need efficiency. * Mike: merger file working, now with new variables total multiplicity, Ecm, missing cuts for H and He * Suwat: voltage step-down should be back from shop soon