Summer student coming next week. Jack will work with him on pin source calibrations
Start up Lab Watch next week
Trouble reports: who gets the notice if N2 stops working? (Answer: right now, no one)
New Wiki Policy
Jon will take the lead on this
everyone is an admin on the HiRA wiki!
Target Drives (Jack)
Had 3 target drives from the transfer experiments. Turned one into new drive for e07038. Would the same design work for the other two drives for future transfer experiments?
target drives are currently in the basement cabinets
TD controllers are packed into S3 cabinet
Jack will talk to Ghulam. Will need to check new target drives before Lee's experiment
RIKEN
presentation by Lu Fei Monday at 7 pm (check your email)
Xe beam likely running November-December
Other Experiments
No official word until after PAC.
Lee is likely to run in the fall, Alan in the spring
Scheduling for longer updates
Jun: May 25
Jon: May 18. TPC project overview
Ring Buffer Readout
Bec: FEE card test ongoing for TPC.
Need new readout system to handle the more data. Zibi discussed with Ron about us switching to Ring Buffer
Short Updates
Jon: has an office! W215
Suwat: needs to schedule committee meeting
Rachel: working on coding LASSA for Jack's experiment
Mike: LASSA efficiency.. many “small” problems
Dan: working on GEANT, able to read energy deposited by individual particles
Zibi: completed edge corrections and accounted for problem strips. Spectra look great! (yields of H, He isotopes).
Zibi talked to Pawel, accounting for charge exchange seems to improve the double ratio, Pawel is thinking about how to implement
Jack: time calibrations for S800 TDC. Very similar slope for all time channels.