e14009 to-do list: - Test dE PA box * How will the biases get from ISEG to PA tower -> 4 cables made by WU (1/9/17) - Zero degree detector * Build mount (UCONN)(1/11/17) * Build detector/Lead (WU) (1/9/17) * Modify copper mouth piece (WU) - Disassemble HiRA Array (Kyle/Pierre/Sean S 1/4) * Install 14 dE detectors (Kyle/Pierre 1/4-1/6) - Reassemble Array (Pierre/Sean S 1/6-1/7) - Install dE PA box (Sean/Juan 1/6) - Test dE's? * Add HINP3 to DAQ (Kyle 1/7-1/8) * Test HINP3 MB with pulsers (Kyle 1/7-1/8) * Test bias distribution with new cables (1/9) * Hunt noise - Install mount for zero degree detector (1/11 -1/14) - Retest Si E and CsI electronics with pulsers/cosmics (1/16) - Alter trigger logic (Trigger will be either EF and EB or EF and EB and Zero Degree) Possible Travel days * Alan 1/11-1/18, 2/3 * Sean/Dan 1/9-1/13 Other items - added 1/17 Implement dE bias for all detectors, test and calibrate dEs Install 0deg detector, internal cabling Setup QDC, test - modify readout and other code to accommodate Install Cu beam blocks - test all Install targets Install beam-pipe section