User Tools

Site Tools


tours:faq

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
tours:faq [2017/06/16 15:21]
constan [Fun facts about FRIB]
tours:faq [2021/01/20 10:04]
constan
Line 3: Line 3:
  
 ===== Questions with Incomplete Answers ===== ===== Questions with Incomplete Answers =====
 +
 +==== Fun facts about FRIB ====
 +  * Will be the world-leading rare isotope facility, with the most powerful heavy-ion beams
 +  * Accelerates heavy ions to ~50% of the speed of light
 +  * Produces rare isotopes that are radioactive and short-lived;​ never found on Earth, but stars make them!
 +  * Is expected to discover ~1000 new isotopes (varieties of elements that have never been observed)
 +  * Will serve over 1500 researchers from 50+ countries
 +  * Facility consists of four buildings, 565,000 gross square feet
 +  * Underground tunnel: 570 feet long, 70 feet wide, 13 feet high; floor is 32 feet underground
 +  * Total Project Cost: $730 million, mostly funded by the US Department of Energy Office of Science
 +  * Home to the #1 US nuclear physics graduate program
 +  * Planned to come online in early 2022
 +
 +==== Why is the cycstopper standing on end, rather than lying flat like the K500/K1200? ====
 +//(from Stefan Schwarz)// Main technical reason: the cyc-stopper is better at accepting large beams (in terms of emittance, i.e. beam width times angle) in its axial = horizontal direction, as built.
 +A bit of background: for the beam to stop efficiently in gas stoppers, it needs to have less energy spread than what we typically get from the A1900.
 +
 +To reduce that energy spread we use what’s known as momentum compression,​ i.e. the process of removing longitudinal energy spread with the help of a dispersive element (big dipole magnets in N3/4) and matched wedge-shaped degraders. However, since we bend/​disperse the beam horizontally,​ the beam quality suffers in that plane. The cyc-stopper’s acceptance is higher in the horizontal direction when ‘standing’,​ so it’s able to make up for the larger beam emittance in that plane.
 +
 +There are also practical reasons: as built, the stopped beam will come out on the fixed south side of the magnet through the central bore. It’s a lot easier to construct an extraction beam line with this concept than taking the beam out through the top or bottom half in a ‘flat’ orientation. Also, access and work on the low-energy ion guides (carpets, conveyor) is a lot easier that way.
 +
 +FYI, we entertained the ‘flat’ orientation for a while in the early design phase, but for the reasons outlined above, we gave up on that rather quickly.
 +
 +==== How much water does the laboratory use? ====
 +//(from Brad Bull)// Our estimated annual usage is about 36M gallons. Peak is 250k a day during the hottest time of year. Most of the water is used for evaporative cooling (cooling towers).
 +
 +==== What will happen to the cyclotrons when they are removed to make way for the FRIB linac? ====
 +//(from Brad Sherrill)//
 +They might be repurposed for other research at MSU. There are no plans to send them anywhere. ​
  
 ==== Can I get a tour of the FRIB tunnel? ==== ==== Can I get a tour of the FRIB tunnel? ====
Line 11: Line 40:
   * Safety gear will be provided   * Safety gear will be provided
  
-==== Fun facts about FRIB ====+==== Fun FRIB facts ====
 //(from Brad Bull's Staff Info talk 6/​24/​17)// ​   //(from Brad Bull's Staff Info talk 6/​24/​17)// ​  
   * Concrete: ~35000 cubic yards   * Concrete: ~35000 cubic yards
Line 19: Line 48:
   * Much off-side fabrication (two sites in Lansing) sped up work   * Much off-side fabrication (two sites in Lansing) sped up work
   * Power consumption:​ 18 MW   * Power consumption:​ 18 MW
 +  * Final square footage: 580,000 (double what NSCL was before)
   * Planning, design, and construction are only 10-20% of total cost of ownership!   * Planning, design, and construction are only 10-20% of total cost of ownership!
  
Line 261: Line 291:
   * 2013: ReA3 reaccelerator commissioned.   * 2013: ReA3 reaccelerator commissioned.
   * 2015: ReA3 experiments begin.   * 2015: ReA3 experiments begin.
-  * 2016: Cyclotron Gas Stopper online?+  * 2019: Cyclotron Gas Stopper online?
   * 2022: FRIB comes online?   * 2022: FRIB comes online?
  
tours/faq.txt · Last modified: 2024/05/30 09:23 by constan