This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
tours:faq [2019/03/12 09:29] constan [How much water does the laboratory use?] |
tours:faq [2019/03/18 16:15] constan [How LONG did it take to build the NSCL/Cyclotrons/other equipment?] |
||
---|---|---|---|
Line 269: | Line 269: | ||
* 2013: ReA3 reaccelerator commissioned. | * 2013: ReA3 reaccelerator commissioned. | ||
* 2015: ReA3 experiments begin. | * 2015: ReA3 experiments begin. | ||
- | * 2016: Cyclotron Gas Stopper online? | + | * 2019: Cyclotron Gas Stopper online? |
* 2022: FRIB comes online? | * 2022: FRIB comes online? | ||