venting_pumping_intermediate_image_box [2018/12/20 15:15]
pereira [Filling Intermediate-image delay PPAC with gas]
venting_pumping_intermediate_image_box [2019/02/13 09:40] (current)
pereira [Removing gas from Intermediate-image delay PPAC]
Line 117: Line 117:
               * Det Bypass V5 (closed)               * Det Bypass V5 (closed)
               * Chmbr Bypass (closed)               * Chmbr Bypass (closed)
-              * I1214V_NCL ​(enabled) ​+              * I214V_NCL ​(enabled) ​
   * PanelMate box "Gas Removal Control"​ should indicate "OK to Start Gas Removal"​. Select that box and click on "Start Gas Removal"​   * PanelMate box "Gas Removal Control"​ should indicate "OK to Start Gas Removal"​. Select that box and click on "Start Gas Removal"​
         * Valves V1 (I214 Gas Sup) and I214V_NCL will close          * Valves V1 (I214 Gas Sup) and I214V_NCL will close 
Line 129: Line 129:
         * I214BON_CONFIM will change to "PPAC BIAS ASSUMED ON"         * I214BON_CONFIM will change to "PPAC BIAS ASSUMED ON"
         * The valves status will be: V1 (closed), V2 (closed), V3 (closed), V4 (closed), V5 (open), V6 (open), I214V_NCL (closed)         * The valves status will be: V1 (closed), V2 (closed), V3 (closed), V4 (closed), V5 (open), V6 (open), I214V_NCL (closed)
- +  * Close the gas bottle valve (sitting near the gas handling system)
  