Vent Object chamber

Requirements: PanelMate file S800Vac

  • Open S800Vac and go to page 01 (“Production Target Box Vacuum System sec 13”)
  • Verify that OBJ SCI is not biased:
    • Check that the detectors is unbiased in the HV module sitting in dU6
    • Notify the system of the bias-off state by selecting the “OBJ_SCI_HV CONFIRM” box and clicking “HV CONFIRM OFF”
  • Isolate chamber by closing gate valves I177GV and I190GV
  • Turn off ion gauge I188IG
  • Check box “PUMPDOWN STATUS BEAMLINE OBJECT BOX”. It should read “Good vacuum”

S800vac Panel Mate.

  • In order to begin venting process, select box “VENT STATUS” and click “BEGIN VENTING PROCEDURE”
    • Box “VENT STATUS” should change from “VENT PROCEDURE STOPPED” to “WAITING FOR VENT TIMER”.
    • Turbo gate valve I214GV will be automatically closed and pressure in chamber will start rising (as seen in I215PG) S800vac Panel Mate: start venting.
    • When I215PG reads atmospheric pressure, select the box “VENT STATUS” and click “STOP VENTING PROCESS”. S800vac Panel Mate: stop venting.
  • The status in the box “VENT STATUS” should change from “WAITING FOR VENT TIMER” to “VENT PROCEDURE STOPPED”
  • You can now open the chamber