This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
venting_pumping_object_box [2023/05/30 14:32] swartzj |
venting_pumping_object_box [2024/02/06 10:40] (current) noji |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Venting/ | ====== Venting/ | ||
+ | |||
+ | In CS-Studio/ | ||
+ | |||
+ | {{: | ||
===== Vent Object chamber ===== | ===== Vent Object chamber ===== | ||
- | From the S800 Main Vacuum page, go to the Object chamber page, opening the page shown in the figure below, and make sure of the following: | + | The vent valve and the roughing valve RV should be closed when you begin. |
- | * Before you start, make sure that the gate valves named D2341 BGV and D2303 BGV are closed and that the IG is off. | + | |
- | * The vent valve should | + | |
- | * Both valves to the turbo pump should be closed and the turbo pump should be switched off. | + | |
- | The procedure is then as follows: | + | The venting |
- | - Close the valve to the roughing | + | - Notify the Control Room and inform them that they can disregard the EXP alarm that will occur |
- | - Now you can plot the pressure | + | - Make sure that the detectors inside the chamber have been unbiased |
- | - **Keep a constant eye on the pressure | + | - Close the beamline gate valves D2341 BGV and D2303 BGV |
- | - You can now enter and open the chamber. | + | - Turn off the IG |
+ | - Close the turbo pump gate valve TVG. If the chamber will be vented for a long time, the turbo pump should be switched off | ||
+ | - Monitor | ||
+ | - Open the vent valve | ||
+ | - When the pressure | ||
===== Pumping Object chamber ===== | ===== Pumping Object chamber ===== | ||
Line 18: | Line 23: | ||
From S800 Vacuum Main Page, go to Object chamber page. This will open the page in the figure below. | From S800 Vacuum Main Page, go to Object chamber page. This will open the page in the figure below. | ||
* Make sure that the IG is off. | * Make sure that the IG is off. | ||
- | * When you start, you should have RV closed, FV open and the TGV valve, Vent valve, as well as the gate valves named D2341 BGV and D2303 BGV all closed. | + | * When you start, you should have RV closed, FV closed |
- | * Close FV and open RV to start pumping down the object chamber with the roughing pump. You can make a plot of the pressure at BPG at this point. | + | * Open RV to start pumping down the object chamber with the roughing pump. You can make a plot of the pressure |
* Section D2337 will initially be red with vacuum status: 'Bad vacuum' | * Section D2337 will initially be red with vacuum status: 'Bad vacuum' | ||
- | * The vacuum reading at FPG needs to drop to below 200 mTorr before you can safely turn on the turbo pump. | + | * Wait until the vacuum reading at FPG to drops to below 200 mTorr before you can safely turn on the turbo pump. |
* After turning on the turbo pump, wait for the inner circle of the pump symbol to turn green and the pump to reach 40 000 rpm before you open the valve at TGV. | * After turning on the turbo pump, wait for the inner circle of the pump symbol to turn green and the pump to reach 40 000 rpm before you open the valve at TGV. | ||
* When the pressure decreases to below 10-3 Torr, you should see the pressure bottom out on your BPG plot, you can turn on the IG and also plot its pressure over time. Section D2337 should turn green and the vacuum status should turn to 'Good vacuum' | * When the pressure decreases to below 10-3 Torr, you should see the pressure bottom out on your BPG plot, you can turn on the IG and also plot its pressure over time. Section D2337 should turn green and the vacuum status should turn to 'Good vacuum' | ||
- | {{ : | + | |