Meeting Minutes February 3, 2012

Present

Zibi, Rachel, Mike, Suwat, Jack, Bill, Betty, Bec; Dan is sick

Updates

  • Bec: Miniball: O ring is being made, Andy Thulin is working on it
  • Ordered a wheeled cart and golf cover for it
  • Rachel: HiRA parts cleaned, Jimmy will assemble next week and show to Bill and Betty
  • Zibi: Room 127: new plan. Requested exhaust for pumps, eyewash, old HiRA source box behind door, food shelf outside. The schedule says we should be moving mid-March
  • Lee/Alan's experiment: no updates on their electronics. Preamp boxes: Lee can build but we need to provide instructions, can use to put in our HiRA preamp boards between flanges and motherboard
  • Right now the preamp boxes are designed to connect the flange to the motherboard
  • don't want to remove HiRA preamps from motherboards
  • Do we have an appropriate flange in storage? It is likely.
  • Mike: correction to Z>2 particles using Tianxiao's light output formula. Looks good! Next need efficiency correction

Efficiency

Jack's program:

  • Pass the name of the chain.. the program plots theta vs phi
  • Program is designed for HiRA but should work for LASSA.
  • Makes filled bins =1
  • Project onto x (theta) axis, then scale by 1/sin(theta)
  • To get absolute efficiency, Jack will output instructions to manipulate to true efficiency.
  • Jack will update more next week.

Zibi's efficiency calculations for Ca+Ca

  • Looking at t/3He
  • Lab: now has energy cuts. Efficiency changes with energy: see more high-energy particles at smaller angles
  • Correction: area of bins/4Pi plotted by theta vs energy