Minutes January 27, 2012

Present

Mike, Rachel, Suwat, Zibi, Jack, Bec, Betty, Bill

Dan–very late! Maybe moving group meeting to accommodate new schedule.

Group Business

  • HiRA boxes: Jimmy is working on cleaning the parts, should finish next week. Then he'll re-make one and show Bill and Betty
  • Si E's were ordered for the new telescopes, have enough CsI crystals
  • Lab moving: repair 124 by mid-February and moving crane over. Do we need a crane in 127? After we move in, maybe
  • Discussion on N111, 127 plans
  • N111: miniball display: Shop suggested they have extra I-beams, we could make a table. Bill suggests a table on wheels.
  • 127: Need to remeasure the test chamber, TPC, door to make sure we have enough room

Computer Committee Update

  • Moved to ring buffers
  • S800 SpecTcl: moving away from the old multicolor gui
  • S800 Apple computer moving from Data U

Updates

  • Dan: Statistics for PV vs. NW within cuts. Meaningful data for single-hit, now moving to multi-hit
  • Zibi: Transverse flow paper for BUU calculations. Will look at energy dependence on efficiency next week
  • Bec: TPC: detector designs, WMU has laser system designed. For Tilak's exp: talking with Jeff Tostevin to fix up TWOFNR
  • Jack: time-stamped files merged for 07038. A few won't merge (<1%) but looking into it.
  • Rachel: t/3He energy spectra, broken up by CsI. Need efficiency.
  • Mike: merger file working, now with new variables total multiplicity, Ecm, missing cuts for H and He
  • Suwat: voltage step-down should be back from shop soon