Meeting Minutes June 1, 2012

Present

Jack, Dan, Chris, Bec, Jon, Suwat, Zibi, Rachel, Mike

Group Business

  • No updates on experiments. Jill is working on the schedule next week
  • Remember to send your fall 2012 availability to Zibi
  • Network access in HiRA lab: we need to decide on location and type of connectivity. Zibi will get helpme to setup our temporary setup while we work on the permanent access.
  • Mike will get solution for clean power conversion to Zibi Monday
  • Jack is working on getting the test chamber set up and cleaning up pile of modules
  • Move small desk to N111 and Bec relocates Samurai stuff
  • Suwat made a work order for adapter cables. Kim suggests that when using the straight-prong connection we cable-tile or lay on a flat surface (or both)
  • Bec bought a new humidity gauge for the miniball display
  • Lab watch: Jon this week. Good… but those working on soldering need to clean up at the end of each day
  • Rachel will talk to Betty about lab ownership, safety notifications on door
  • Bill has an REU student coming Monday

Updates

  • Jack: E1 timing, use up or down? Look into E1.tup - E2 time
  • Mike: verifying efficiency in lassa, next will do t/3He
  • Dan: light output in GEANT, want angular distributions
  • Rachel: making files for miniball/neutron walls for 05049. Looks like some miniball tubes moved around
  • Suwat: step down. Review drawing before it goes to shop
  • Jon: matching for samurai TPC. Lots of cleaning going on
  • Bec: ribs for top plate arrived, new (hopefully now correct) parts coming in Monday. Converting basement room to a clean rom

Zibi: Efficiency & Edge Correction

  • correct data for edge effects
  • binning important–need to be fine enough for edge-effect correction will not work as well
  • differential multiplicity: need to account for lack of full-range in theta
  • 2D spectra are useful to diagnose.