e14009 to-do list:

  1. Test dE PA box
    • How will the biases get from ISEG to PA tower → 4 cables made by WU (1/9/17)
  2. Zero degree detector
    • Build mount (UCONN)(1/11/17)
    • Build detector/Lead (WU) (1/9/17)
    • Modify copper mouth piece (WU)
  3. Disassemble HiRA Array (Kyle/Pierre/Sean S 1/4)
    • Install 14 dE detectors (Kyle/Pierre 1/4-1/6)
  4. Reassemble Array (Pierre/Sean S 1/6-1/7)
  5. Install dE PA box (Sean/Juan 1/6)
  6. Test dE's?
    • Add HINP3 to DAQ (Kyle 1/7-1/8)
    • Test HINP3 MB with pulsers (Kyle 1/7-1/8)
    • Test bias distribution with new cables (1/9)
    • Hunt noise
  7. Install mount for zero degree detector (1/11 -1/14)
  8. Retest Si E and CsI electronics with pulsers/cosmics (1/16)
  9. Alter trigger logic (Trigger will be either EF and EB or EF and EB and Zero Degree)

Possible Travel days

  • Alan 1/11-1/18, 2/3
  • Sean/Dan 1/9-1/13

Other items - added 1/17 Implement dE bias for all detectors, test and calibrate dEs Install 0deg detector, internal cabling Setup QDC, test - modify readout and other code to accommodate Install Cu beam blocks - test all Install targets Install beam-pipe section