e14009 to-do list:
Before e14002
Test dE PA box
Zero degree detector
Find and test dE cables from e10011
Test dE's?
May replace 1-2 telescopes with HiRA upgrade
Design/modify mounting structure to support these detectors
Does Alan have separate calibration beams?
Test HiRA upgrade CsI (Sean, Pierre)
After 14002
Remove HiRA telescopes and install dE detectors
Install mount for zero degree detector
Install dE PA box
Remount HiRA telescopes and zero degree detector
Set up dE bias –> ISEG
Test dE with alpha source
Retest Si E and CsI electronics with pulsers/cosmics
Alter trigger logic